Optimizing Operation of Water Supply Reservoir : The Role of Constraints

المؤلفون المشاركون

Zhao, Tongtiegang
Zhao, Jianshi

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-15، 15ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-03-18

دولة النشر

مصر

عدد الصفحات

15

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper presents a mathematical analysis of water supply reservoir operation.

The analysis illustrates one-stage, two-stage, and three-stage formulations of multiple-period reservoir operation depending on the effects of operational constraints.

There is a one-stage model when storage capacity constraints are nonbinding.

Release decisions depend on total water availability and exhibit equal marginal utilities.

Binding upper (lower) storage capacity constraint blocks the effect of decreased (increased) water availability in the subsequent stages on release decisions in the preceding stages.

When one storage capacity constraint is binding, multiple periods become two stages and a gap occurs between marginal utilities of water.

When there are one upper and one lower binding storage capacity constraints, reservoir operation is characterized as a three-stage model.

Effects of forecast uncertainty and ending storage on reservoir operation are affected by reservoir storage capacity.

When the storage capacity constraints are nonbinding, the reservoir can regulate streamflow in an extended timeframe, and current release decision is affected by forecast uncertainty of total streamflow and ending storage.

When the storage capacity constraints are binding, the reservoir can regulate streamflow only in a short timeframe, and current release decision is primarily affected by forecast uncertainty of streamflow in the current stage.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhao, Tongtiegang& Zhao, Jianshi. 2014. Optimizing Operation of Water Supply Reservoir : The Role of Constraints. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-15.
https://search.emarefa.net/detail/BIM-503487

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhao, Tongtiegang& Zhao, Jianshi. Optimizing Operation of Water Supply Reservoir : The Role of Constraints. Mathematical Problems in Engineering No. 2014 (2014), pp.1-15.
https://search.emarefa.net/detail/BIM-503487

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhao, Tongtiegang& Zhao, Jianshi. Optimizing Operation of Water Supply Reservoir : The Role of Constraints. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-15.
https://search.emarefa.net/detail/BIM-503487

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-503487