Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir

المؤلفون المشاركون

Lu, Jing
Tiab, Djebbar

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2010، العدد 2010 (31 ديسمبر/كانون الأول 2010)، ص ص. 1-35، 35ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2010-04-08

دولة النشر

مصر

عدد الصفحات

35

التخصصات الرئيسية

هندسة مدنية

الملخص EN

For a bounded reservoir with no flow boundaries, the pseudo-steady-state flow regime is common at long-producing times.

Taking a partially penetrating well as a uniform line sink in three dimensional space, by the orthogonal decomposition of Dirac function and using Green's function to three-dimensional Laplace equation with homogeneous Neumann boundary condition, this paper presents step-by-step derivations of a pseudo-steady-state productivity formula for a partially penetrating vertical well arbitrarily located in a closed anisotropic box-shaped drainage volume.

A formula for calculating pseudo skin factor due to partial penetration is derived in detailed steps.

A convenient expression is presented for calculating the shape factor of an isotropic rectangle reservoir with a single fully penetrating vertical well, for arbitrary aspect ratio of the rectangle, and for arbitrary position of the well within the rectangle.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lu, Jing& Tiab, Djebbar. 2010. Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir. Mathematical Problems in Engineering،Vol. 2010, no. 2010, pp.1-35.
https://search.emarefa.net/detail/BIM-507107

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lu, Jing& Tiab, Djebbar. Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir. Mathematical Problems in Engineering No. 2010 (2010), pp.1-35.
https://search.emarefa.net/detail/BIM-507107

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lu, Jing& Tiab, Djebbar. Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir. Mathematical Problems in Engineering. 2010. Vol. 2010, no. 2010, pp.1-35.
https://search.emarefa.net/detail/BIM-507107

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-507107