The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors

المؤلفون المشاركون

D'Auria, Francesco
Mazzantini, Oscar Alberto

المصدر

Science and Technology of Nuclear Installations

العدد

المجلد 2011، العدد 2011 (31 ديسمبر/كانون الأول 2011)، ص ص. 1-9، 9ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2010-12-16

دولة النشر

مصر

عدد الصفحات

9

التخصصات الرئيسية

العلوم الهندسية و تكنولوجيا المعلومات

الملخص EN

Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (Best Estimate Plus Uncertainty) approach has been selected for issuing of the Chapter 15 on FSAR (Final Safety Analysis Report).

The key steps of the entire process are basically two: (a) the selection of PIE (Postulated Initiating Events) and (b) the analysis by best estimate models supported by uncertainty evaluation.

Otherwise, key elements of the approach are (1) availability of qualified computational tools including suitable uncertainty method, (2) demonstration of quality, and (3) acceptability and endorsement by the licensing authority.

The effort of issuing Chapter 15 is terminated at the time of issuing of the present paper, and the safety margins available for the operation of the concerned NPP (Nuclear Power Plant) have been quantified.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

D'Auria, Francesco& Mazzantini, Oscar Alberto. 2010. The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors. Science and Technology of Nuclear Installations،Vol. 2011, no. 2011, pp.1-9.
https://search.emarefa.net/detail/BIM-511418

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

D'Auria, Francesco& Mazzantini, Oscar Alberto. The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors. Science and Technology of Nuclear Installations No. 2011 (2011), pp.1-9.
https://search.emarefa.net/detail/BIM-511418

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

D'Auria, Francesco& Mazzantini, Oscar Alberto. The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors. Science and Technology of Nuclear Installations. 2010. Vol. 2011, no. 2011, pp.1-9.
https://search.emarefa.net/detail/BIM-511418

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-511418