Optimal Discount Rates for Government Projects

المؤلف

Park, Sangkyun

المصدر

ISRN Economics

العدد

المجلد 2012، العدد 2012 (31 ديسمبر/كانون الأول 2012)، ص ص. 1-13، 13ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2012-07-17

دولة النشر

مصر

عدد الصفحات

13

التخصصات الرئيسية

الاقتصاد

الملخص EN

Project selection based on the net present value can be optimal only if the discount rate is optimal.

The optimal discount rate for a government project can be a risk-free rate, a comparable market rate (market interest rate corresponding to the risk of cash flows to the government), or an adjusted market rate, depending on circumstances.

This paper clarifies the conditions for each case.

Provided that the optimal discount rate is the comparable market rate, it varies across intervention methods and changes with the subsidy rate.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Park, Sangkyun. 2012. Optimal Discount Rates for Government Projects. ISRN Economics،Vol. 2012, no. 2012, pp.1-13.
https://search.emarefa.net/detail/BIM-513365

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Park, Sangkyun. Optimal Discount Rates for Government Projects. ISRN Economics No. 2012 (2012), pp.1-13.
https://search.emarefa.net/detail/BIM-513365

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Park, Sangkyun. Optimal Discount Rates for Government Projects. ISRN Economics. 2012. Vol. 2012, no. 2012, pp.1-13.
https://search.emarefa.net/detail/BIM-513365

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-513365