Delay Analysis of GTS Bridging between IEEE 802.15.4 and IEEE 802.11 Networks for Healthcare Applications
المؤلفون المشاركون
Mišić, Jelena
(Sherman) Shen, Xuemin
المصدر
International Journal of Telemedicine and Applications
العدد
المجلد 2009، العدد 2009 (31 ديسمبر/كانون الأول 2009)، ص ص. 1-13، 13ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2008-12-02
دولة النشر
مصر
عدد الصفحات
13
التخصصات الرئيسية
الملخص EN
We consider interconnection of IEEE 802.15.4 beacon-enabled network cluster with IEEE 802.11b network.
This scenario is important in healthcare applications where IEEE 802.15.4 nodes comprise patient's body area network (BAN) and are involved in sensing some health-related data.
BAN nodes have very short communication range in order to avoid harming patient's health and save energy.
Sensed data needs to be transmitted to an access point in the ward room using wireless technology with higher transmission range and rate such as IEEE 802.11b.
We model the interconnected network where IEEE 802.15.4-based BAN operates in guaranteed time slot (GTS) mode, and IEEE 802.11b part of the bridge conveys GTS superframe to the 802.11b access point.
We then analyze the network delays.
Performance analysis is performed using EKG traffic from continuous telemetry, and we discuss the delays of communication due the increasing number of patients.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Mišić, Jelena& (Sherman) Shen, Xuemin. 2008. Delay Analysis of GTS Bridging between IEEE 802.15.4 and IEEE 802.11 Networks for Healthcare Applications. International Journal of Telemedicine and Applications،Vol. 2009, no. 2009, pp.1-13.
https://search.emarefa.net/detail/BIM-513861
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Mišić, Jelena& (Sherman) Shen, Xuemin. Delay Analysis of GTS Bridging between IEEE 802.15.4 and IEEE 802.11 Networks for Healthcare Applications. International Journal of Telemedicine and Applications No. 2009 (2009), pp.1-13.
https://search.emarefa.net/detail/BIM-513861
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Mišić, Jelena& (Sherman) Shen, Xuemin. Delay Analysis of GTS Bridging between IEEE 802.15.4 and IEEE 802.11 Networks for Healthcare Applications. International Journal of Telemedicine and Applications. 2008. Vol. 2009, no. 2009, pp.1-13.
https://search.emarefa.net/detail/BIM-513861
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-513861
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر