A comparative investigation to evaluate the productivity in construction projects between Jordan and Iraq : case study : finishing works in residential buildings

مقدم أطروحة جامعية

Jadduh, Sarah Hasan

مشرف أطروحة جامعية

al-Rawi, Urabi

أعضاء اللجنة

Abu Rumman, Ghayda
al-Tarawinah, Sultan Abd al-Rahman Dhiyab

الجامعة

جامعة الإسراء

الكلية

كلية الهندسة

القسم الأكاديمي

قسم الهندسة المدنية

دولة الجامعة

الأردن

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2015

الملخص الإنجليزي

A construction industry is one of the most important sector components, and the success of any construction project depends primarily on the effectiveness of the engineering management for all activities related to this project (i.e., from the project starting date till its finishing date).

Several investigations indicated that various factors affecting the construction management; therefore, determining these factors and designing a control system to them could show a huge difference in the project's productivity, as well as labor productivity.

The field study for this research included a designed questionnaire sheet, then evaluate obtained data using SPSS program.

Considering the results of the practical part of this research, several findings were obtained, such as, the survey showed that the most affecting factors on the basic time are , Awaiting for materials (outside delivery) , Fatigue , Lack of access , etc.

There is an agreement that labor productivity measurement is important to improve labor work performance on construction sites and that labor productivity has the most impact on work performance.

The research indicated twelve factors affecting labor productivity; however, the most of these are: lack of availability of skilled workers, accuracy of the estimates, weather conditions, inadequate supervision, inadequate supplies and changes order, therefore it is recommended that the project manager should pay attention to those factors in order to obtain the desired productivity.

التخصصات الرئيسية

الهندسة المدنية

الموضوعات

عدد الصفحات

155

قائمة المحتويات

Table of contents.

Abstract.

Chapter One : Introduction.

Chapter Two : Literature review.

Chapter Three : Methodology.

Chapter Four : Site data and analysis.

Chapter Five : Conclusions and recommendations

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jadduh, Sarah Hasan. (2015). A comparative investigation to evaluate the productivity in construction projects between Jordan and Iraq : case study : finishing works in residential buildings. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-649089

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jadduh, Sarah Hasan. A comparative investigation to evaluate the productivity in construction projects between Jordan and Iraq : case study : finishing works in residential buildings. (Master's theses Theses and Dissertations Master). Isra University. (2015).
https://search.emarefa.net/detail/BIM-649089

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jadduh, Sarah Hasan. (2015). A comparative investigation to evaluate the productivity in construction projects between Jordan and Iraq : case study : finishing works in residential buildings. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-649089

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-649089