Application of earned value management to compute the project performance using analytical network process
المؤلفون المشاركون
Ramani, Sujatha Evangelin
Sruthi, N.
المصدر
Jordan Journal of Civil Engineering
العدد
المجلد 10، العدد 2 (30 يونيو/حزيران 2016)، ص ص. 254-265، 12ص.
الناشر
جامعة العلوم و التكنولوجيا الأردنية عمادة البحث العلمي
تاريخ النشر
2016-06-30
دولة النشر
الأردن
عدد الصفحات
12
التخصصات الرئيسية
الملخص EN
Every project confronts risk both in financial and technical dimensions.
This induces a greater response on the performance of the project.
A successful construction project depends on how the project participants compute the actual project performance.
A commendable assessment of project performance practice determines the project productivity both quantitatively and qualitatively.
Methods of project performance measurement vary among industries.
As a contribution to the above, this study equips the project manager with a proficient mode of project performance measurement and the essential promising decisions that head to profit maximization.
This intricate study thus facilitates the project manager to compute the project performance on the basis of the effects of Earned Value Management (EVM) indices which are broadly classified as: variance indices, performance indices and miscellaneous or forecast indices.
Adopting the Analytical Network Process (ANP) structure model in Super Decision software is a reliable decision making tool.
This study indicates that the cost variance (CV) index is prominent among the EVM indices that highly affect the project characteristics, the measurement of which facilitates the required control measures on respective project activities.
It also indicates that cost is the major project characteristic, the variation of which immensely affects the project performance.
It procures an objective reference for engineering projects by following the selection process of best EVM indices that holds an accurate measure of project performance.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Ramani, Sujatha Evangelin& Sruthi, N.. 2016. Application of earned value management to compute the project performance using analytical network process. Jordan Journal of Civil Engineering،Vol. 10, no. 2, pp.254-265.
https://search.emarefa.net/detail/BIM-678325
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Ramani, Sujatha Evangelin& Sruthi, N.. Application of earned value management to compute the project performance using analytical network process. Jordan Journal of Civil Engineering Vol. 10, no. 2 (2016), pp.254-265.
https://search.emarefa.net/detail/BIM-678325
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Ramani, Sujatha Evangelin& Sruthi, N.. Application of earned value management to compute the project performance using analytical network process. Jordan Journal of Civil Engineering. 2016. Vol. 10, no. 2, pp.254-265.
https://search.emarefa.net/detail/BIM-678325
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 265
رقم السجل
BIM-678325
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر