Balancing lexicographic multi-objective assembly lines with multi-manned stations

المؤلف

Kellegöz, Talip

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2016، العدد 2016 (31 ديسمبر/كانون الأول 2016)، ص ص. 1-20، 20ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2016-04-28

دولة النشر

مصر

عدد الصفحات

20

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In a multi-manned assembly line, tasks of the same workpiece can be executed simultaneously by different workers working in the same station.

This line has significant advantages over a simple assembly line such as shorter line length, less work-in-process, smaller installation space, and less product flow time.

In many realistic line balancing situations, there are usually more than one objective conflicting with each other.

This paper presents a preemptive goal programming model and some heuristic methods based on variable neighborhood search approach for multi-objective assembly line balancing problems with multi-manned stations.

Three different objectives are considered, minimizing the total number of multi-manned stations as the primary objective, minimizing the total number of workers as the secondary objective, and smoothing the number of workers at stations as the tertiary objective.

A set of test instances taken from the literature is solved to compare the performance of all methods, and results are presented.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Kellegöz, Talip. 2016. Balancing lexicographic multi-objective assembly lines with multi-manned stations. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-20.
https://search.emarefa.net/detail/BIM-689062

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Kellegöz, Talip. Balancing lexicographic multi-objective assembly lines with multi-manned stations. Mathematical Problems in Engineering No. 2016 (2016), pp.1-20.
https://search.emarefa.net/detail/BIM-689062

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Kellegöz, Talip. Balancing lexicographic multi-objective assembly lines with multi-manned stations. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-20.
https://search.emarefa.net/detail/BIM-689062

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 19-20

رقم السجل

BIM-689062