Risk mitigation model in agile approach
العناوين الأخرى
تخفيف المخاطر في طرق الهندسة الرشيقة
مقدم أطروحة جامعية
مشرف أطروحة جامعية
أعضاء اللجنة
al-Fayyumi, Muhammad
Khatatneh, Khalaf
الجامعة
جامعة الإسراء
الكلية
كلية تكنولوجيا المعلومات
القسم الأكاديمي
قسم هندسة البرمجيات
دولة الجامعة
الأردن
الدرجة العلمية
ماجستير
تاريخ الدرجة العلمية
2016
الملخص الإنجليزي
Agile approach is one of the most widely approach used in software development, where it is considered as one of the software project management approach.
During development a software some risks may occur, which adversary affects on project and leads to the project failure.
For instance, incomplete requirement/ backlog that are initially begin, where iteration/sprints that are constructed through, ambiguity in task stories, making team development confused, lack of stakeholder involvement during iterations, lack of trained team members in agile methodology, product owners that don't have ability to express their needs, poor analyst experience to extract and understand product owners needs, poor sharing information among team members, and other risks that affect the project negatively, all are leading to failure.
Many of these risks are related to stakeholders and requirements, most of previous works tried to reduce the negative impact of selecting random stakeholders.
At the same time, they did not investigate what about selecting stakeholders in a way that minimize the risks that may occur from ambiguity of requirements that were collected to them.
The present work proposed a methodology to minimize and mitigate such risks by selecting proper stakeholders for requirement elicitation in order to have complete, understandable and consistent requirements.
The proposed methodology supports the development team to understand the requirements clearly without ambiguity to regulate the labor and deliver it within the specified time and budget.
Furthermore, it supports selecting stakeholders that they can follow up with the development team throughout the construction and implementation of the project period.
The present work, reduces large proportion of risks that team development facing in project.
التخصصات الرئيسية
عدد الصفحات
82
قائمة المحتويات
Table of contents.
Abstract.
Abstract in Arabic.
Chapter One : Introduction.
Chapter Two : Related works.
Chapter Three : Stakeholder identification.
Chapter Four : Stakeholder filtering.
Chapter Five : Stakeholder prioritization.
Chapter Six : Results and discussion.
References.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Nadaf, Arij Ahmad. (2016). Risk mitigation model in agile approach. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-707413
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Nadaf, Arij Ahmad. Risk mitigation model in agile approach. (Master's theses Theses and Dissertations Master). Isra University. (2016).
https://search.emarefa.net/detail/BIM-707413
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Nadaf, Arij Ahmad. (2016). Risk mitigation model in agile approach. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-707413
لغة النص
الإنجليزية
نوع البيانات
رسائل جامعية
رقم السجل
BIM-707413
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر