Optimum selection of subcontractors in Jordan

مقدم أطروحة جامعية

Abu Nada, Shirin Yahya Ahmad

مشرف أطروحة جامعية

al-Hadithi, Ibrahim A. Muhammad

أعضاء اللجنة

al-Tarawinah, Khalid
Hiyassat, Muhammad

الجامعة

جامعة الإسراء

الكلية

كلية الهندسة

القسم الأكاديمي

قسم الهندسة المدنية

دولة الجامعة

الأردن

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2016

الملخص الإنجليزي

The construction industry is a major part of the Jordanian economy.

Contracting companies carry out important construction projects in cooperation with subcontractors, that makes subcontractor selection is an important part of the project management.

Consequently when awarding construction contracts depending on the price only, it is not always a successful strategy and it may result in many problems like: delay, cost overrun, and bad quality.

There are many aspect beside price should be taken into consideration when selecting the suitable subcontractor like: quality, time, and safety.

The main objectives of this research are to identify and rank the factors used by main contractors in the selection of suitable subcontractors in Jordan, and to propose recommendations for improving the selection of subcontractors.

From previous literature the study revealed the important factors used by consultants and main contractors for selection of prequalified subcontractors.

A structured questionnaire was constructed to rank the importance of each of these factors in Jordan, and then a model using linear programming (Assignment Model) was constructed to study many cases toward subcontractors’ selection.

Also the effect of selecting subcontractor based on prequalification criteria and optimization procedure was studied.

The study found the important factors used by main contractors for selection of suitable subcontractors include: “estimated time of project, estimated tender price, technical ability, financial ability, management capabilities and safety”, respectively.

The evaluation technique used in this research combined the price of bids and the time needed to finish the project beside the prequalification technique; others research don’t combine these in one model; all of them starts with prequalification technique for the financial and technical ability then the lowest bid price is selected.

The study is also found that distribution of bids among subcontractors is different when the prequalification is used and the total cost of all projects will differ too.

The most important recommendation to Contractors is to select the subcontractor according to his previous experience, reputation and capabilities in terms of labors, equipment, and machinery, since these items ensure completing the works according to the time schedule and achieve the best quality.

On the other hand subcontractors are recommended to use qualified labors, and good materials to ensure satisfying the required quality, in order to be able to adhere to main contractor requirements and time schedule.

Key word: subcontractor, prequalification, Optimization, selection criteria, Linear Programming, Assignment Model

التخصصات الرئيسية

الهندسة المدنية

عدد الصفحات

114

قائمة المحتويات

Table of contents.

Abstract.

Chapter One : Introduction.

Chapter Two : Literature review.

Chapter Three : Methodological framework.

Chapter Four : Data analysis and result discussion

Chapter Five : Case study on linear programming.

Chapter Six : Conclusions and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Abu Nada, Shirin Yahya Ahmad. (2016). Optimum selection of subcontractors in Jordan. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-720719

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Abu Nada, Shirin Yahya Ahmad. Optimum selection of subcontractors in Jordan. (Master's theses Theses and Dissertations Master). Isra University. (2016).
https://search.emarefa.net/detail/BIM-720719

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Abu Nada, Shirin Yahya Ahmad. (2016). Optimum selection of subcontractors in Jordan. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-720719

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-720719