Optimum resources utilization for multirepetitive construction projects in Jordan

مقدم أطروحة جامعية

Rushdi, Amani Muhammad

مشرف أطروحة جامعية

Muhammad, Ibrahim Abd

أعضاء اللجنة

Muslim, Majid
al-Tarawinah, Sultan

الجامعة

جامعة الإسراء

الكلية

كلية الهندسة

القسم الأكاديمي

قسم الهندسة المدنية

دولة الجامعة

الأردن

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2017

الملخص الإنجليزي

The objective of our study is to create a mathematical model for multi repetitive projects, then solving it by integer optimization model taking into consideration the available budget and project duration to achieve the maximum profit for each project, then constructing the realistic schedule that fit with different constraints.

The study consists of ten projects and each project has repetitive activities.

The difficulties in our study being in collecting information from construction companies about each project, which include the number of units that will be constructed, budget, duration, cost and profit then converting this information into equations.

The mathematical model will be constructed using the available information.

The integer linear programming model which contains 57 constraints and 32 variables has been used to solve the mathematical model to get the optimum allocation of financial resources for our case study.

We can conclude from this research that scheduling multi projects with traditional techniques such as Critical Path Method (CPM) or Program Evaluation and Review Technique (PERT) by using the available information will not give the optimum results, but using the mathematical model in combination with the optimization techniques will reduce the cost of constructing projects, increasing the profits and arranging priorities in constructing different projects.

Finally, we recommended to use the mathematical model in combination with the optimization technique in scheduling different projects in construction companies to add the reality in scheduling projects and to get the optimum results

التخصصات الرئيسية

الهندسة المدنية

الموضوعات

عدد الصفحات

106

قائمة المحتويات

Table of contents.

Abstract.

Chapter One : Introduction.

Chapter Two : Operation research and modeling.

Chapter Three : Optimization techniques.

Chapter Four : Methodology and mathematical model construction.

Chapter Five : Conclusions and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Rushdi, Amani Muhammad. (2017). Optimum resources utilization for multirepetitive construction projects in Jordan. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-750321

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Rushdi, Amani Muhammad. Optimum resources utilization for multirepetitive construction projects in Jordan. (Master's theses Theses and Dissertations Master). Isra University. (2017).
https://search.emarefa.net/detail/BIM-750321

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Rushdi, Amani Muhammad. (2017). Optimum resources utilization for multirepetitive construction projects in Jordan. (Master's theses Theses and Dissertations Master). Isra University, Jordan
https://search.emarefa.net/detail/BIM-750321

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-750321