Controlling of time-overrun in construction projects in Iraq
المؤلفون المشاركون
المصدر
Engineering and Technology Journal
العدد
المجلد 35، العدد 2A (28 فبراير/شباط 2017)، ص ص. 111-117، 7ص.
الناشر
تاريخ النشر
2017-02-28
دولة النشر
العراق
عدد الصفحات
7
التخصصات الرئيسية
العلوم الهندسية والتكنولوجية (متداخلة التخصصات)
الملخص EN
This paper is about analyzing time overrun in construction projects.
The principle targets are centered on researching the causes, effects and strategies for controlling time over-run in development ventures in Iraq.
The study has been accomplished based on previous researches in addition to a questionnaire form and case studies.
Forty-two factors of time overrun causes under four main responsible parties were distinguished (owner, consultant, contractor, others).
Eight major impacts of time overrun were also identified.
The questionnaire form was formulated based on the above data and was distributed to the selected respondents which are professionals in construction industry.
Depending on the results of the questionnaire form, the major origin of time overrun was found that the contractor is the responsible for most of the time overrun (i.e.
Contractor's financial difficulties Shortage of skilled manpower and the other causes related to him).
The most important two impacts of time overrun were Increase the cost of the project, Quality degradation and Increasing in overhead expenses, the highest percentage of time-overrun in the nine existed project 319% and the most common causes were (change in economic condition and Company's lack of experience).According to the research findings a management system has been proposed to control on the time overrun in construction projects.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Khalil, T. A.& Hadi, I. Z.. 2017. Controlling of time-overrun in construction projects in Iraq. Engineering and Technology Journal،Vol. 35, no. 2A, pp.111-117.
https://search.emarefa.net/detail/BIM-770039
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Khalil, T. A.& Hadi, I. Z.. Controlling of time-overrun in construction projects in Iraq. Engineering and Technology Journal Vol. 35, no. 2A (2017), pp.111-117.
https://search.emarefa.net/detail/BIM-770039
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Khalil, T. A.& Hadi, I. Z.. Controlling of time-overrun in construction projects in Iraq. Engineering and Technology Journal. 2017. Vol. 35, no. 2A, pp.111-117.
https://search.emarefa.net/detail/BIM-770039
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes appendix : p. 117
رقم السجل
BIM-770039
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر