Time and cost overruns on construction projects : practical case studies
المؤلفون المشاركون
Inshasi, Adnan
al-Najjar, Jumah Muhammad
المصدر
الناشر
الجامعة الإسلامية كلية الهندسة
تاريخ النشر
2014-11-30
دولة النشر
فلسطين (قطاع غزة)
عدد الصفحات
11
التخصصات الرئيسية
العلوم الهندسية والتكنولوجية (متداخلة التخصصات)
الملخص الإنجليزي
Construction industry is considered as one of the most important industries in Palestine.
It is known that most construction projects in Gaza strip exposed to time and cost overrun.
This phenomenon may affect the progress of local construction industry ; many contractors may face the danger of being forced out of business in the long run.
The aim of this paper is to assess factors influencing time and cost overruns on construction projects in Gaza strip through several case studies.
Contractors, consultants and owners views were considered.
The results indicated that continuous changes in specifications and incomplete drawings, owners delay in freeing the payments to contractors, fluctuation in the cost of materials, cash problems during construction, lack of management experience, lack of consultant experience, and change order are the main factors which contributed to time and cost overruns.
Contracting parties are advised to consider these factors and others in this study in order to avoid or minimize time and cost overruns.
Some recommendations are suggested to contracting parties in the paper.
نوع البيانات
أوراق مؤتمرات
رقم السجل
BIM-775088
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
al-Najjar, Jumah Muhammad& Inshasi, Adnan. 2014-11-30. Time and cost overruns on construction projects : practical case studies. . , pp.387-397.Gaza Palestine : Islamic University of Gaza Faculty of Engineering.
https://search.emarefa.net/detail/BIM-775088
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
al-Najjar, Jumah Muhammad& Inshasi, Adnan. Time and cost overruns on construction projects : practical case studies. . Gaza Palestine : Islamic University of Gaza Faculty of Engineering. 2014-11-30.
https://search.emarefa.net/detail/BIM-775088
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
al-Najjar, Jumah Muhammad& Inshasi, Adnan. Time and cost overruns on construction projects : practical case studies. .
https://search.emarefa.net/detail/BIM-775088
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر