Modeling contractor’s cash-in-flow in public school building projects in Karbala

العناوين الأخرى

نمذجة التدفقات النقدية الداخلة للمقاول في مشاريع أبنية المدارس الحكومية في كربلاء

المؤلفون المشاركون

Khalid, Ziyad Sulayman Muhammad
Aswad, Ghafil Karim

المصدر

al-Nahrain Journal for Engineering Sciences

العدد

المجلد 20، العدد 5 (31 ديسمبر/كانون الأول 2017)، ص ص. 1064-1070، 7ص.

الناشر

جامعة النهرين كلية الهندسة

تاريخ النشر

2017-12-31

دولة النشر

العراق

عدد الصفحات

7

التخصصات الرئيسية

الهندسة المدنية

الملخص EN

Public school building projects in Karbala Province experiences payment problems due to improper cash-flow planning by both parties; contractors and clients.

These payment problems lead to work stoppages and conflicts.

This research aims at developing a suitable model to forecast the expected contractors’ cash-in-flow in public school building projects in Karbala based on historical data.

Complete sets of interim payments of (33) out of (38) school building projects finished in the years (2007-2012) in Karbala were interpolated using seven different regression methods namely; Polynomial, Gompertz, Morgan-Morgan-Finney, Logistic, Exponential, Gaussian and Linear in order to identify the best-suited model.

It is found that the third degree polynomial model is more suitable for cash-in-flow forecasting of the case under study with coefficient of correlation of (97.89%) and standard error of (0.0441).

Data of the remaining (5) projects were used to test the validity of the best-fitted model using Mean Absolute Percentage Error, Root Mean Square Error and Average Accuracy Percentage.

The model is expected to be of high advantage in predicting contractors’ cash-in-flow in public school building projects in Karbala, and consequently clients’ cash-out-flow as well.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Khalid, Ziyad Sulayman Muhammad& Aswad, Ghafil Karim. 2017. Modeling contractor’s cash-in-flow in public school building projects in Karbala. al-Nahrain Journal for Engineering Sciences،Vol. 20, no. 5, pp.1064-1070.
https://search.emarefa.net/detail/BIM-849173

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Khalid, Ziyad Sulayman Muhammad& Aswad, Ghafil Karim. Modeling contractor’s cash-in-flow in public school building projects in Karbala. al-Nahrain Journal for Engineering Sciences Vol. 20, no. 5 (2017), pp.1064-1070.
https://search.emarefa.net/detail/BIM-849173

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Khalid, Ziyad Sulayman Muhammad& Aswad, Ghafil Karim. Modeling contractor’s cash-in-flow in public school building projects in Karbala. al-Nahrain Journal for Engineering Sciences. 2017. Vol. 20, no. 5, pp.1064-1070.
https://search.emarefa.net/detail/BIM-849173

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

رقم السجل

BIM-849173