Torque and drag forces problems in highly deviated oil well

العناوين الأخرى

مشاكل قوى عزم الدوران و السحب في الآبار النفطية شديدة الميلان

المؤلفون المشاركون

Nimah, Hasan Ali
Abd al-Razzaq, Iyad Abd al-Halim

المصدر

Iraqi Journal of Chemical and Petroleum Engineering

العدد

المجلد 19، العدد 3 (30 سبتمبر/أيلول 2018)، ص ص. 19-31، 13ص.

الناشر

جامعة بغداد كلية الهندسة

تاريخ النشر

2018-09-30

دولة النشر

العراق

عدد الصفحات

13

التخصصات الرئيسية

العلوم الهندسية والتكنولوجية (متداخلة التخصصات)

الملخص EN

Excessive torque and drag can be critical limitation during drilling highly deviated oil wells.

Using the modeling is regarded as an invaluable process to assist in well planning and to predict and prevent drilling problems.

Identify which problems lead to excessive torque and drag to prevent cost losses and equipment damage.

Proper modeling data is highly important for knowing and prediction hole problems may occur due to torque and drag and select the best method to avoid these problems related to well bore and drill string.

In this study, Torque and drag well plan program from landmark worldwide programming group (Halliburton Company) used to identify hole problems.one deviated well in Zubair oil fields named, ZB-250 selected for analyses the effect of friction factor on torque and effective `tension of the drill string along well depth, moreover the effect of well bore problems such as; mud losses, accumulation of cutting bed in the well bore, stuck pipe, caving, sloughing, high torque and drag values on drill string components and well trajectory.

Wells data which include hole section size, mud properties, well profile survey, casing string depth, rig specification, drill string components, drilling parameters like weight on bit, rotary speed and flow rate were used to compare between planning and drilling stages for these wells and identify the reasons of difference between these stages.

The results showed a difference for the drilling phase and increasable in effective tension, torque, pick up and slack off drag, measured string weight, and possibility to occur the buckling if compare with planning phase.

Wellbore instability, high friction factor, high tortuosity, high flow rate ,stuck pipe , excessive drag spot, partial to total losses, increase of drilling parameters, hard formations and bad hole cleaning, all these factors yield to this difference between planning and actual phases.

When drilling hole section 8.5", the main causes of varying were drilling fluid losses, high value of friction factor, stuck pipe and friction forces when the maximum torque was (16 to 20 klb-ft) and pick up weight (20-40 klb)

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Nimah, Hasan Ali& Abd al-Razzaq, Iyad Abd al-Halim. 2018. Torque and drag forces problems in highly deviated oil well. Iraqi Journal of Chemical and Petroleum Engineering،Vol. 19, no. 3, pp.19-31.
https://search.emarefa.net/detail/BIM-852844

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Nimah, Hasan Ali& Abd al-Razzaq, Iyad Abd al-Halim. Torque and drag forces problems in highly deviated oil well. Iraqi Journal of Chemical and Petroleum Engineering Vol. 19, no. 3 (Sep. 2018), pp.19-31.
https://search.emarefa.net/detail/BIM-852844

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Nimah, Hasan Ali& Abd al-Razzaq, Iyad Abd al-Halim. Torque and drag forces problems in highly deviated oil well. Iraqi Journal of Chemical and Petroleum Engineering. 2018. Vol. 19, no. 3, pp.19-31.
https://search.emarefa.net/detail/BIM-852844

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes appendix : p. 30

رقم السجل

BIM-852844