Load management programs comparison : time of using and real-time pricing

المؤلف

Ahmad, A. S.

المصدر

Journal of al Azhar University : Engineering Sector

العدد

المجلد 11، العدد 40 (31 يوليو/تموز 2016)، ص ص. 1039-1045، 7ص.

الناشر

جامعة الأزهر كلية الهندسة

تاريخ النشر

2016-07-31

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

العلوم الهندسية والتكنولوجية (متداخلة التخصصات)

الملخص EN

Demand-side management (DSM) programs in the industrial sector appear to be economically feasible due to the large controllable loads and relatively low costs per control point.

Innovative electricity tariffs provide one of the most important DSM alternatives.

Because real-time pricing (RTP) is considered as management option which reflects the real cost of generating electricity to the end user, the electricity cost saving potential of RTP through demand management is presented in this paper.

These variables include the installed power consumption capacity of the plant, the plant's spare energy consumption capacity, and terms that describe the structure of the RTP tariff.

Time of using (TOU) pricing compared with (RTP) is presented, can either be applied as an LM program or as incentive to drive the economics and the motivation to implement other types of LM programs.

TOU pricing also can be taken as a way for consumers to adjust the electricity consumption among different time axis in accordance with the cost of electricity.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Ahmad, A. S.. 2016. Load management programs comparison : time of using and real-time pricing. Journal of al Azhar University : Engineering Sector،Vol. 11, no. 40, pp.1039-1045.
https://search.emarefa.net/detail/BIM-856116

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Ahmad, A. S.. Load management programs comparison : time of using and real-time pricing. Journal of al Azhar University : Engineering Sector Vol. 11, no. 40 (Jul. 2016), pp.1039-1045.
https://search.emarefa.net/detail/BIM-856116

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Ahmad, A. S.. Load management programs comparison : time of using and real-time pricing. Journal of al Azhar University : Engineering Sector. 2016. Vol. 11, no. 40, pp.1039-1045.
https://search.emarefa.net/detail/BIM-856116

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

رقم السجل

BIM-856116