Cost estimation of building construction projects in Gaza Strip using support vector machines model (SVM)‎

العناوين الأخرى

تقدير تكلفة مشاريع المباني الإنشائية في قطاع غزة باستخدام نموذج آلات الدعم الناقل

مقدم أطروحة جامعية

Rayyan, Tariq Muhammad Mahmud

مشرف أطروحة جامعية

al-Sawalihi, Nabil Ibrahim

الجامعة

الجامعة الإسلامية

الكلية

كلية الهندسة

القسم الأكاديمي

قسم الهندسة المدنية

دولة الجامعة

فلسطين (قطاع غزة)

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2016

الملخص الإنجليزي

Construction industry is considered an important sector for the development in Gaza Strip.

Estimating process is an important element of the construction industry.

Early stage cost estimate plays a significant role in the success of any construction project. The research aims to predict the parametric cost estimation in construction building projects in Gaza Strip using support vector machine model. This research has been conducted through literature reviews of the cost estimating process, followed by a field survey done by structured interviews to define the factors which effect the parametric cost estimation of building construction projects. The study shows that nine factors are affecting construction cost.

The main factors are the area of typical floor, numbers of stories and the building type.

Eighty case studies from real executed construction projects in Gaza Strip were collected to build up SVM model. Neurosolution software version 6.07 was used to train the models.

The results of the trained models indicated that SVM reasonably succeeded in estimating the cost of building projects without the need for more detailed drawings.

The average error of test dataset for the adapted model was 2.3% which is largely acceptable. One of the main recommendations of this research is to join the developed model with cost index to give an accurate estimate in any time.

In addition, it encourages all parties involved in construction industry to pay more attention for developing model in cost estimation by archiving all projects data, and conducting more studies and workshops to obtain maximum advantage of this new approach.

التخصصات الرئيسية

الهندسة المدنية

عدد الصفحات

87

قائمة المحتويات

Table of contents.

Abstract.

Abstract in Arabic.

Chapter One : Introduction.

Chapter Two : Literature review.

Chapter Three : Methodology.

Chapter Four : Data collection and results.

Chapter Five : Model development.

Chapter Six : Conclusions and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Rayyan, Tariq Muhammad Mahmud. (2016). Cost estimation of building construction projects in Gaza Strip using support vector machines model (SVM). (Master's theses Theses and Dissertations Master). Islamic University, Palestine (Gaza Strip)
https://search.emarefa.net/detail/BIM-904982

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Rayyan, Tariq Muhammad Mahmud. Cost estimation of building construction projects in Gaza Strip using support vector machines model (SVM). (Master's theses Theses and Dissertations Master). Islamic University. (2016).
https://search.emarefa.net/detail/BIM-904982

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Rayyan, Tariq Muhammad Mahmud. (2016). Cost estimation of building construction projects in Gaza Strip using support vector machines model (SVM). (Master's theses Theses and Dissertations Master). Islamic University, Palestine (Gaza Strip)
https://search.emarefa.net/detail/BIM-904982

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-904982