Cost and time risk management in construction projects
العناوين الأخرى
إدارة مخاطر التكلفة والوقت في المشاريع الإنشائية
المؤلف
المصدر
Tikrit Journal of Engineering Sciences
العدد
المجلد 25، العدد 1 (31 مارس/آذار 2018)، ص ص. 42-48، 7ص.
الناشر
تاريخ النشر
2018-03-31
دولة النشر
العراق
عدد الصفحات
7
التخصصات الرئيسية
الملخص EN
Identifying and evaluating the business risk (Cost and time overruns) management in construction projects to control and minimize such risk is the aim of this research.
In diverse construction site, qualified professional workings are asked through an online questionnaire to collect tremendous diverse thoughts to compare between them.
The questionnaire developed the research and collected more sensitive/accurate and reliable data about construction business risk management.
The first step in this research is to attain worthy information about business risk management in term of cost and time overruns from previous related studies.
A theoretical background about management of business risk is provided by the review of these studies that led to the design of the questionnaire questions.
This paper concluded that poor business performance, such as time delays and cost overruns, are common in construction projects.
Poor business performances can be significantly reduced by providing adequate construction planning at the beginning of the project, accurate in estimation, preventing changes in projects during construction, improving contract management and improving communication between construction parties
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Said, Yusuf Salam. 2018. Cost and time risk management in construction projects. Tikrit Journal of Engineering Sciences،Vol. 25, no. 1, pp.42-48.
https://search.emarefa.net/detail/BIM-938913
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Said, Yusuf Salam. Cost and time risk management in construction projects. Tikrit Journal of Engineering Sciences Vol. 25, no. 1 (2018), pp.42-48.
https://search.emarefa.net/detail/BIM-938913
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Said, Yusuf Salam. Cost and time risk management in construction projects. Tikrit Journal of Engineering Sciences. 2018. Vol. 25, no. 1, pp.42-48.
https://search.emarefa.net/detail/BIM-938913
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
رقم السجل
BIM-938913
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر