Simulation-optimization model for Dokan reservoir system operation

العناوين الأخرى

نموذج محاكاة الأمثل لتشغيل نظام خزان دوكان

عدد الاستشهادات بقاعدة ارسيف : 
1

المؤلفون المشاركون

Ibrahim, Hikmat Mustafa
Uthman, Luqman Sabir

المصدر

Sulaimani Journal of Engineering Sciences

العدد

المجلد 4، العدد 5 (31 ديسمبر/كانون الأول 2017)، ص ص. 7-25، 19ص.

الناشر

University of Sulaimani

تاريخ النشر

2017-12-31

دولة النشر

العراق

عدد الصفحات

19

التخصصات الرئيسية

الهندسة الميكانيكية

الملخص EN

Reservoir operation system is the essential part of water resources management, and each reservoir has a special policy for operation.

Simulation and optimization are two different techniques for the operating process of any reservoir.

Combined simulation-optimization (S-O) model as a new technique in recent years to minimize the deficit in hydropower generation and irrigation demand has been developed for Dokan reservoir system in Kurdistan Region, Iraq.

The model combines the Simulink and genetic algorithm (GA) as techniques for simulation and optimization respectively.

For comparison, one traditional simulation model based on the standard operating policy (SOP) and two optimization models using nonlinear programming (NLP) and discrete differential dynamic programming (DDDP) optimization methods was developed.

In the present study, three performance evaluation criteria, namely; reliability, resiliency and vulnerability have been used for comparing and evaluating the developed models.

The proposed models were run over a period of 54 years using monthly time step interval, i.e.

648 months starting from Jan-1958 to Dec-2011.

The results reveal that the SOP model (Model-I) has serious deficit events in minimum downstream demands, although, it has a higher reliability in the irrigation demand (0.94).

In addition, the other models; NLP, DDDP and S-O by considering weight factors (w_1=0.2) and (w_2=0.8)almost have the same reliability, 0.90, 0.90 and 0.91 respectively.

Furthermore, the results show a low resilience for NLP model and a high vulnerability for S-O modelwhich causes higher severity of failure events.

Moreover, for the operation period from 1995 to 2011, the annual productions of hydropower are 1280, 1339, 1344and 1296 MW by increasing of 24.9, 30.64, 31.16 and 26.46 % more than the actual hydropower production (1025 MW) for SOP, NLP, DDDP and S-O models respectively.

Finally, the conclusions present that the DDDP optimization model provides high reliability as well as more power generation at the same time.

The model can be more easily applied to solve the nonlinear and multi objective problems with less computational time.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Uthman, Luqman Sabir& Ibrahim, Hikmat Mustafa. 2017. Simulation-optimization model for Dokan reservoir system operation. Sulaimani Journal of Engineering Sciences،Vol. 4, no. 5, pp.7-25.
https://search.emarefa.net/detail/BIM-940830

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Uthman, Luqman Sabir& Ibrahim, Hikmat Mustafa. Simulation-optimization model for Dokan reservoir system operation. Sulaimani Journal of Engineering Sciences Vol. 4, no. 5 (2017), pp.7-25.
https://search.emarefa.net/detail/BIM-940830

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Uthman, Luqman Sabir& Ibrahim, Hikmat Mustafa. Simulation-optimization model for Dokan reservoir system operation. Sulaimani Journal of Engineering Sciences. 2017. Vol. 4, no. 5, pp.7-25.
https://search.emarefa.net/detail/BIM-940830

نوع البيانات

مقالات

لغة النص

الإنجليزية

رقم السجل

BIM-940830