Investigation of cost control measures for main contractors in construction projects
العناوين الأخرى
تحري تدابير السيطرة للمقاولين الرئيسيين على كلف مشاريع التشييد
المؤلفون المشاركون
Ali, Layth Thamir
Ali, Raid Salim Abd
Muhammad, Ziyad Sulayman
المصدر
Journal of University of Babylon for Engineering Sciences
العدد
المجلد 27، العدد 4 (31 ديسمبر/كانون الأول 2019)، ص ص. 222-241، 20ص.
الناشر
تاريخ النشر
2019-12-31
دولة النشر
العراق
عدد الصفحات
20
التخصصات الرئيسية
الموضوعات
الملخص EN
Based on previous research by the authors, (59) cost control factors in construction projects were identified in which (13) were considered as the most influential factors.
In this research, control measures that are potentially within the hands of main contractors were investigated according to the opinions of some Iraqi professional engineers of high experience.
A questionnaire survey consisting of (55) control measures for the (13) most influential factors were suggested.
When ranking those measures, based on the highest (RII), it was found that contractors should focus on; using modern techniques and tools to improve labor productivity, using modern design programs to give clear visualization to the owner so changes is reduced, setting solid rules to attain good performance for contractors, S/C and suppliers, paying liabilities on time to avoid shortage of funding, insure periodical maintenance to enhance equipment performance and lower downtime, integrity and anti-corruption, using work study techniques to insure proper site planning, proper selection of project managers, using modern planning and scheduling techniques, prepare suitable safe off-site locations for backup material storage, insure previous planning for equipment specification and labor skills, insure selecting reliable suppliers.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Ali, Layth Thamir& Ali, Raid Salim Abd& Muhammad, Ziyad Sulayman. 2019. Investigation of cost control measures for main contractors in construction projects. Journal of University of Babylon for Engineering Sciences،Vol. 27, no. 4, pp.222-241.
https://search.emarefa.net/detail/BIM-950000
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Ali, Layth Thamir…[et al.]. Investigation of cost control measures for main contractors in construction projects. Journal of University of Babylon for Engineering Sciences Vol. 27, no. 4 (2019), pp.222-241.
https://search.emarefa.net/detail/BIM-950000
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Ali, Layth Thamir& Ali, Raid Salim Abd& Muhammad, Ziyad Sulayman. Investigation of cost control measures for main contractors in construction projects. Journal of University of Babylon for Engineering Sciences. 2019. Vol. 27, no. 4, pp.222-241.
https://search.emarefa.net/detail/BIM-950000
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 239-240
رقم السجل
BIM-950000
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر