Productivity estimation model for bracklayer in construction projects using neural network
Other Title(s)
بناء نموذج لتخمين إنتاجية البناء بالطابوق في المشاريع الإنشائية باستخدام الشبكات العصبية
Author
Source
al-Qadisiyah Journal for Engineering Sciences
Issue
Vol. 9, Issue 2 (30 Jun. 2016), pp.183-199, 17 p.
Publisher
al-Qadisiyah University College of Engineering
Publication Date
2016-06-30
Country of Publication
Iraq
No. of Pages
17
Main Subjects
Engineering & Technology Sciences (Multidisciplinary)
American Psychological Association (APA)
Aswad, Ghafil Karim. 2016. Productivity estimation model for bracklayer in construction projects using neural network. al-Qadisiyah Journal for Engineering Sciences،Vol. 9, no. 2, pp.183-199.
https://search.emarefa.net/detail/BIM-815377
Modern Language Association (MLA)
Aswad, Ghafil Karim. Productivity estimation model for bracklayer in construction projects using neural network. al-Qadisiyah Journal for Engineering Sciences Vol. 9, no. 2 (2016), pp.183-199.
https://search.emarefa.net/detail/BIM-815377
American Medical Association (AMA)
Aswad, Ghafil Karim. Productivity estimation model for bracklayer in construction projects using neural network. al-Qadisiyah Journal for Engineering Sciences. 2016. Vol. 9, no. 2, pp.183-199.
https://search.emarefa.net/detail/BIM-815377
Data Type
Journal Articles
Language
English
Record ID
BIM-815377