Productivity estimation model for bracklayer in construction projects using neural network

Other Title(s)

بناء نموذج لتخمين إنتاجية البناء بالطابوق في المشاريع الإنشائية باستخدام الشبكات العصبية

Author

Aswad, Ghafil Karim

Source

al-Qadisiyah Journal for Engineering Sciences

Issue

Vol. 9, Issue 2 (30 Jun. 2016), pp.183-199, 17 p.

Publisher

al-Qadisiyah University College of Engineering

Publication Date

2016-06-30

Country of Publication

Iraq

No. of Pages

17

Main Subjects

Engineering & Technology Sciences (Multidisciplinary)

American Psychological Association (APA)

Aswad, Ghafil Karim. 2016. Productivity estimation model for bracklayer in construction projects using neural network. al-Qadisiyah Journal for Engineering Sciences،Vol. 9, no. 2, pp.183-199.
https://search.emarefa.net/detail/BIM-815377

Modern Language Association (MLA)

Aswad, Ghafil Karim. Productivity estimation model for bracklayer in construction projects using neural network. al-Qadisiyah Journal for Engineering Sciences Vol. 9, no. 2 (2016), pp.183-199.
https://search.emarefa.net/detail/BIM-815377

American Medical Association (AMA)

Aswad, Ghafil Karim. Productivity estimation model for bracklayer in construction projects using neural network. al-Qadisiyah Journal for Engineering Sciences. 2016. Vol. 9, no. 2, pp.183-199.
https://search.emarefa.net/detail/BIM-815377

Data Type

Journal Articles

Language

English

Record ID

BIM-815377