Minimizing the Makespan for Scheduling Problems with General Deterioration Effects

Joint Authors

Huang, Kai
Yu, Xianyu
Zhang, Yu-lin

Source

Mathematical Problems in Engineering

Issue

Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-8, 8 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2013-12-21

Country of Publication

Egypt

No. of Pages

8

Main Subjects

Civil Engineering

Abstract EN

This paper investigates the scheduling problems with general deterioration models.

By the deterioration models, the actual processing time functions of jobs depend not only on the scheduled position in the job sequence but also on the total weighted normal processing times of the jobs already processed.

In this paper, the objective is to minimize the makespan.

For the single-machine scheduling problems with general deterioration effects, we show that the considered problems are polynomially solvable.

For the flow shop scheduling problems with general deterioration effects, we also show that the problems can be optimally solved in polynomial time under the proposed conditions.

American Psychological Association (APA)

Yu, Xianyu& Zhang, Yu-lin& Huang, Kai. 2013. Minimizing the Makespan for Scheduling Problems with General Deterioration Effects. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-8.
https://search.emarefa.net/detail/BIM-1008759

Modern Language Association (MLA)

Yu, Xianyu…[et al.]. Minimizing the Makespan for Scheduling Problems with General Deterioration Effects. Mathematical Problems in Engineering No. 2013 (2013), pp.1-8.
https://search.emarefa.net/detail/BIM-1008759

American Medical Association (AMA)

Yu, Xianyu& Zhang, Yu-lin& Huang, Kai. Minimizing the Makespan for Scheduling Problems with General Deterioration Effects. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-8.
https://search.emarefa.net/detail/BIM-1008759

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1008759