Value management of the risks for the implementation of fast-tracking (SDFT) construction projects
Other Title(s)
إدارة القيمة لمخاطر تشيد المشاريع الهندسية سريعة التنفيذ
Joint Authors
Hashim, Amirah
Faruq, Akram
Abd al-Fattah, Mutazz
Source
Journal of al Azhar University : Engineering Sector
Issue
Vol. 15, Issue 57 (31 Oct. 2020), pp.1064-1073, 10 p.
Publisher
al-Azhar University Faculty of Engineering
Publication Date
2020-10-31
Country of Publication
Egypt
No. of Pages
10
Main Subjects
Topics
Abstract AR
الغرض من هذه الورقة: هو تعريف و تحليل عوامل المخاطر التي لها تأثير سيء على أهداف مشروع المسار السريع في مصر(التكلفة و الجودة والوقت ) باستخدام استراتيجيات تحليل القيمة و المخاطر معا.
Abstract EN
Purpose: The purpose of this paper is todefine and analyse the factors of risks, which have bad
impact on fast track project's goals in Egypt (cost, Quality, time ), by using value and risk
analysis's strategies together.
Design/methodology/approach: This research used three technique to collect data, the first on is
a comprehensive questionnaire survey, the second one is interviews, and the third one is a
brainstorming session with major construction project stakeholders.
Then research used
qualitative technique to analysis their responses to find the most critical risks, and value
strategies to make alternative solution which help stakeholders to deal with risks and achieve
project's cost, time and Quality
Findings: The findings lead to the conclusion that there is a need to develop management
system, which combine between value management and risk management, to help stakeholders to
make the right decision as early as possible to deal with risks.
In addition, the results showed that
there are common and critical risks, which must take care about it from the first stage in fast
track`1 construction in Egypt to suggest pervious alternative solutions to save project's value and
goals.
Originality/value: The paper identifies current fast track project's risks in Egypt and
presents alternative solutions, which can help stakeholders to overcome them.
American Psychological Association (APA)
Hashim, Amirah& Faruq, Akram& Abd al-Fattah, Mutazz. 2020. Value management of the risks for the implementation of fast-tracking (SDFT) construction projects. Journal of al Azhar University : Engineering Sector،Vol. 15, no. 57, pp.1064-1073.
https://search.emarefa.net/detail/BIM-1009662
Modern Language Association (MLA)
Hashim, Amirah…[et al.]. Value management of the risks for the implementation of fast-tracking (SDFT) construction projects. Journal of al Azhar University : Engineering Sector Vol. 15, no. 57 (Oct. 2020), pp.1064-1073.
https://search.emarefa.net/detail/BIM-1009662
American Medical Association (AMA)
Hashim, Amirah& Faruq, Akram& Abd al-Fattah, Mutazz. Value management of the risks for the implementation of fast-tracking (SDFT) construction projects. Journal of al Azhar University : Engineering Sector. 2020. Vol. 15, no. 57, pp.1064-1073.
https://search.emarefa.net/detail/BIM-1009662
Data Type
Journal Articles
Language
English
Notes
-
Record ID
BIM-1009662