A Fuzzy ANP Model Integrated with Benefits, Opportunities, Costs, and Risks to Prioritize Intelligent Power Grid Systems
Joint Authors
Source
Mathematical Problems in Engineering
Issue
Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-9, 9 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2013-06-24
Country of Publication
Egypt
No. of Pages
9
Main Subjects
Abstract EN
Although growth of renewable energy is envisaged, many concerns are critical like the ability to maintain the balance between demands and supply and the variability, noncontrollability, and flexibility of the sources.
Then, what will be the future concerns about the main composition of intelligent power grid systems in the future? There is no such research tackled before.
Thus, this paper first finds critical success criteria of intelligent power grid systems and then constructs a multiple criteria and decision making model to help in identifying the suitable trends under complex economic performance, environmental impacts, and rapid technological and marketing changes.
After empirical demonstration, the paper summarizes that the most suitable composition of future intelligent power grid systems should be constituted by “DHT” P2P grid, “C&D workflow” P2P scheduling, “GARCM” trustworthy P2P grid, and “multipurpose” grid applications in the future.
American Psychological Association (APA)
Chen, Hsing Hung& Gu, Hao. 2013. A Fuzzy ANP Model Integrated with Benefits, Opportunities, Costs, and Risks to Prioritize Intelligent Power Grid Systems. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-9.
https://search.emarefa.net/detail/BIM-1010722
Modern Language Association (MLA)
Chen, Hsing Hung& Gu, Hao. A Fuzzy ANP Model Integrated with Benefits, Opportunities, Costs, and Risks to Prioritize Intelligent Power Grid Systems. Mathematical Problems in Engineering No. 2013 (2013), pp.1-9.
https://search.emarefa.net/detail/BIM-1010722
American Medical Association (AMA)
Chen, Hsing Hung& Gu, Hao. A Fuzzy ANP Model Integrated with Benefits, Opportunities, Costs, and Risks to Prioritize Intelligent Power Grid Systems. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-9.
https://search.emarefa.net/detail/BIM-1010722
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1010722