Single-Machine Scheduling with Accelerating Learning Effects

Joint Authors

Cheng, T. C. E.
Tseng, Shih-Chang
Lai, Peng-Jen
Lee, Wen Chiung

Source

Mathematical Problems in Engineering

Issue

Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-7, 7 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2013-11-14

Country of Publication

Egypt

No. of Pages

7

Main Subjects

Civil Engineering

Abstract EN

Scheduling with learning effects has been widely studied.

However, there are situations where the learning effect might accelerate.

In this paper, we propose a new model where the learning effect accelerates as time goes by.

We derive the optimal solutions for the single-machine problems to minimize the makespan, total completion time, total weighted completion time, maximum lateness, maximum tardiness, and total tardiness.

American Psychological Association (APA)

Cheng, T. C. E.& Tseng, Shih-Chang& Lai, Peng-Jen& Lee, Wen Chiung. 2013. Single-Machine Scheduling with Accelerating Learning Effects. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-7.
https://search.emarefa.net/detail/BIM-1010829

Modern Language Association (MLA)

Cheng, T. C. E.…[et al.]. Single-Machine Scheduling with Accelerating Learning Effects. Mathematical Problems in Engineering No. 2013 (2013), pp.1-7.
https://search.emarefa.net/detail/BIM-1010829

American Medical Association (AMA)

Cheng, T. C. E.& Tseng, Shih-Chang& Lai, Peng-Jen& Lee, Wen Chiung. Single-Machine Scheduling with Accelerating Learning Effects. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-7.
https://search.emarefa.net/detail/BIM-1010829

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1010829