Congestion Service Facilities Location Problem with Promise of Response Time

Joint Authors

Hu, Dandan
Hu, Wenshan
Liu, Zhi-Wei

Source

Mathematical Problems in Engineering

Issue

Vol. 2013, Issue 2013 (31 Dec. 2013), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2013-11-13

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

In many services, promise of specific response time is advertised as a commitment by the service providers for the customer satisfaction.

Congestion on service facilities could delay the delivery of the services and hurts the overall satisfaction.

In this paper, congestion service facilities location problem with promise of response time is studied, and a mixed integer nonlinear programming model is presented with budget constrained.

The facilities are modeled as M/M/c queues.

The decision variables of the model are the locations of the service facilities and the number of servers at each facility.

The objective function is to maximize the demands served within specific response time promised by the service provider.

To solve this problem, we propose an algorithm that combines greedy and genetic algorithms.

In order to verify the proposed algorithm, a lot of computational experiments are tested.

And the results demonstrate that response time has a significant impact on location decision.

American Psychological Association (APA)

Hu, Dandan& Liu, Zhi-Wei& Hu, Wenshan. 2013. Congestion Service Facilities Location Problem with Promise of Response Time. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-11.
https://search.emarefa.net/detail/BIM-1032113

Modern Language Association (MLA)

Hu, Dandan…[et al.]. Congestion Service Facilities Location Problem with Promise of Response Time. Mathematical Problems in Engineering No. 2013 (2013), pp.1-11.
https://search.emarefa.net/detail/BIM-1032113

American Medical Association (AMA)

Hu, Dandan& Liu, Zhi-Wei& Hu, Wenshan. Congestion Service Facilities Location Problem with Promise of Response Time. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-11.
https://search.emarefa.net/detail/BIM-1032113

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1032113