Applying Dynamic Priority Scheduling Scheme to Static Systems of Pinwheel Task Model in Power-Aware Scheduling

Joint Authors

Seol, Ye-In
Kim, Young-Kuk

Source

The Scientific World Journal

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-07-08

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Medicine
Information Technology and Computer Science

Abstract EN

Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS).

In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems.

In pinwheel task model, each task’s priority is static and its execution sequence could be predetermined.

There have been many static approaches to power-aware scheduling in pinwheel task model.

But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model.

This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing.

Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system.

The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model.

The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10–80% over the existing algorithms.

American Psychological Association (APA)

Seol, Ye-In& Kim, Young-Kuk. 2014. Applying Dynamic Priority Scheduling Scheme to Static Systems of Pinwheel Task Model in Power-Aware Scheduling. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-9.
https://search.emarefa.net/detail/BIM-1050221

Modern Language Association (MLA)

Seol, Ye-In& Kim, Young-Kuk. Applying Dynamic Priority Scheduling Scheme to Static Systems of Pinwheel Task Model in Power-Aware Scheduling. The Scientific World Journal No. 2014 (2014), pp.1-9.
https://search.emarefa.net/detail/BIM-1050221

American Medical Association (AMA)

Seol, Ye-In& Kim, Young-Kuk. Applying Dynamic Priority Scheduling Scheme to Static Systems of Pinwheel Task Model in Power-Aware Scheduling. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-9.
https://search.emarefa.net/detail/BIM-1050221

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1050221