Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

Joint Authors

Mat Saman, Muhamad Zameri
Tan, Choy Soon
Kung Leong, Tiong
Zakuan, Norhayati
Ariff, Mohd. Shoki Md.

Source

The Scientific World Journal

Issue

Vol. 2014, Issue 2014 (31 Dec. 2014), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2014-02-19

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Medicine
Information Technology and Computer Science

Abstract EN

This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry.

This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory.

Data collected was analyzed using correlation and regression analysis.

The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results.

Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

American Psychological Association (APA)

Kung Leong, Tiong& Zakuan, Norhayati& Mat Saman, Muhamad Zameri& Ariff, Mohd. Shoki Md.& Tan, Choy Soon. 2014. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-9.
https://search.emarefa.net/detail/BIM-1050240

Modern Language Association (MLA)

Kung Leong, Tiong…[et al.]. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry. The Scientific World Journal No. 2014 (2014), pp.1-9.
https://search.emarefa.net/detail/BIM-1050240

American Medical Association (AMA)

Kung Leong, Tiong& Zakuan, Norhayati& Mat Saman, Muhamad Zameri& Ariff, Mohd. Shoki Md.& Tan, Choy Soon. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-9.
https://search.emarefa.net/detail/BIM-1050240

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1050240