![](/images/graphics-bg.png)
Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times
Joint Authors
Source
Mathematical Problems in Engineering
Issue
Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-9, 9 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2015-07-28
Country of Publication
Egypt
No. of Pages
9
Main Subjects
Abstract EN
We investigate a single machine group scheduling problem with positiondependent processing times and ready times.
The actual processing time of a job is a function of positivegroup-dependent job-independent positional factors.
The actual setup time of the group is a linearfunction of the total completion time of the former group.
Each job has a release time.
The decisionshould be taken regarding possible sequences of jobs in each group and group sequence to minimize themakespan.
We show that jobs in each group are scheduled in nondecreasing order of its release time andthe groups are arranged in nondecreasing order of some certain conditions.
We also present a polynomialtime solution procedure for the special case of the proposed problem.
American Psychological Association (APA)
Xingong, Zhang& Xie, Qiulian. 2015. Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-9.
https://search.emarefa.net/detail/BIM-1073220
Modern Language Association (MLA)
Xingong, Zhang& Xie, Qiulian. Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times. Mathematical Problems in Engineering No. 2015 (2015), pp.1-9.
https://search.emarefa.net/detail/BIM-1073220
American Medical Association (AMA)
Xingong, Zhang& Xie, Qiulian. Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-9.
https://search.emarefa.net/detail/BIM-1073220
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1073220