Study on Real-Time Simulation Analysis and Inverse Analysis System for Temperature and Stress of Concrete Dam
Joint Authors
Li, Bing-Qi
Zhang, Lei
Zhang, Guoxin
Zhang, Songtao
Yi, Liu
Source
Mathematical Problems in Engineering
Issue
Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-8, 8 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2015-05-21
Country of Publication
Egypt
No. of Pages
8
Main Subjects
Abstract EN
In the concrete dam construction, it is very necessary to strengthen the real-time monitoring and scientific management of concrete temperature control.
This paper constructs the analysis and inverse analysis system of temperature stress simulation, which is based on various useful data collected in real time in the process of concrete construction.
The system can produce automatically data file of temperature and stress calculation and then achieve the remote real-time simulation calculation of temperature stress by using high performance computing techniques, so the inverse analysis can be carried out based on a basis of monitoring data in the database; it fulfills the automatic feedback calculation according to the error requirement and generates the corresponding curve and chart after the automatic processing and analysis of corresponding results.
The system realizes the automation and intellectualization of complex data analysis and preparation work in simulation process and complex data adjustment in the inverse analysis process, which can facilitate the real-time tracking simulation and feedback analysis of concrete temperature stress in construction process and enable you to discover problems timely, take measures timely, and adjust construction scheme and can well instruct you how to ensure project quality.
American Psychological Association (APA)
Zhang, Lei& Yi, Liu& Li, Bing-Qi& Zhang, Guoxin& Zhang, Songtao. 2015. Study on Real-Time Simulation Analysis and Inverse Analysis System for Temperature and Stress of Concrete Dam. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-8.
https://search.emarefa.net/detail/BIM-1073476
Modern Language Association (MLA)
Zhang, Lei…[et al.]. Study on Real-Time Simulation Analysis and Inverse Analysis System for Temperature and Stress of Concrete Dam. Mathematical Problems in Engineering No. 2015 (2015), pp.1-8.
https://search.emarefa.net/detail/BIM-1073476
American Medical Association (AMA)
Zhang, Lei& Yi, Liu& Li, Bing-Qi& Zhang, Guoxin& Zhang, Songtao. Study on Real-Time Simulation Analysis and Inverse Analysis System for Temperature and Stress of Concrete Dam. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-8.
https://search.emarefa.net/detail/BIM-1073476
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1073476