Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times

Joint Authors

Kim, Jae-Gon
Lim, Seung-Kil
Bang, June-Young

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-07-27

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

Lot-order assignment is to assign items in lots being processed to orders to fulfill the orders.

It is usually performed periodically for meeting the due dates of orders especially in a manufacturing industry with a long production cycle time such as the semiconductor manufacturing industry.

In this paper, we consider the lot-order assignment problem (LOAP) with the objective of minimizing the total tardiness of the orders with distinct due dates.

We show that we can solve the LOAP optimally by finding an optimal sequence for the single-machine total tardiness scheduling problem with nonnegative time-dependent processing times (SMTTSP-NNTDPT).

Also, we address how the priority rules for the SMTTSP can be modified to those for the SMTTSP-NNTDPT to solve the LOAP.

In computational experiments, we discuss the performances of the suggested priority rules and show the result of the proposed approach outperforms that of the commercial optimization software package.

American Psychological Association (APA)

Kim, Jae-Gon& Lim, Seung-Kil& Bang, June-Young. 2015. Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-11.
https://search.emarefa.net/detail/BIM-1073833

Modern Language Association (MLA)

Kim, Jae-Gon…[et al.]. Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times. Mathematical Problems in Engineering No. 2015 (2015), pp.1-11.
https://search.emarefa.net/detail/BIM-1073833

American Medical Association (AMA)

Kim, Jae-Gon& Lim, Seung-Kil& Bang, June-Young. Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-11.
https://search.emarefa.net/detail/BIM-1073833

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1073833