Integrated Supply Chain Cooperative Inventory Model with Payment Period Being Dependent on Purchasing Price under Defective Rate Condition

Joint Authors

Yang, M. F.
Lin, Yi
Kuo, Jun-Yuan
Chen, Wei-Hao

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-20, 20 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-04-20

Country of Publication

Egypt

No. of Pages

20

Main Subjects

Civil Engineering

Abstract EN

In most commercial transactions, the buyer and vendor may usually agree to postpone payment deadline.

During such delayed period, the buyer is entitled to keep the products without having to pay the sale price.

However, the vendor usually hopes to receive full payment as soon as possible, especially when the transaction involves valuable items; yet, the buyer would offer a higher purchasing price in exchange of a longer postponement.

Therefore, we assumed such permissible delayed period is dependent on the purchasing price.

As for the manufacturing side, defective products are inevitable from time to time, and not all of those defective products can be repaired.

Hence, we would like to add defective production and repair rate to our proposed model and discuss how these factors may affect profits.

In addition, holding cost, ordering cost, and transportation cost will also be considered as we develop the integrated inventory model with price-dependent payment period under the possible condition of defective products.

We would like to find the maximum of the joint expected total profit for our model and come up with a suitable inventory policy accordingly.

In the end, we have also provided a numerical example to clearly illustrate possible solutions.

American Psychological Association (APA)

Yang, M. F.& Kuo, Jun-Yuan& Chen, Wei-Hao& Lin, Yi. 2015. Integrated Supply Chain Cooperative Inventory Model with Payment Period Being Dependent on Purchasing Price under Defective Rate Condition. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-20.
https://search.emarefa.net/detail/BIM-1074019

Modern Language Association (MLA)

Yang, M. F.…[et al.]. Integrated Supply Chain Cooperative Inventory Model with Payment Period Being Dependent on Purchasing Price under Defective Rate Condition. Mathematical Problems in Engineering No. 2015 (2015), pp.1-20.
https://search.emarefa.net/detail/BIM-1074019

American Medical Association (AMA)

Yang, M. F.& Kuo, Jun-Yuan& Chen, Wei-Hao& Lin, Yi. Integrated Supply Chain Cooperative Inventory Model with Payment Period Being Dependent on Purchasing Price under Defective Rate Condition. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-20.
https://search.emarefa.net/detail/BIM-1074019

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1074019