A Branch and Bound Algorithm for Project Scheduling Problem with Spatial Resource Constraints

Joint Authors

Hu, Shicheng
Sun, Xuedong
Wang, Song
Kao, Yonggui
Ito, Takao

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-10-25

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Civil Engineering

Abstract EN

With respect to the block assembly schedule in a shipbuilding enterprise, a spatial resource constrained project scheduling problem (SRCPSP) is proposed, which aims to minimize the makespan of a project under the constraints of the availability of a two-dimensional spatial resource and the precedence relationship between tasks.

In order to solve SRCPSP to the optimum, a branch and bound algorithm (BB) is developed.

For the BB-SRCPSP, first, an implicitly enumerative branch scheme is presented.

Secondly, a precedence based lower bound, as well as an effective dominance rule, is employed for pruning.

Next, a heuristic based algorithm is used to decide the order of a node to be selected for expansion such that the efficiency of the algorithm is further improved.

In addition, a maximal space based arrangement is applied to the configuration of the areas required each day in an available area.

Finally, the simulation experiment is conducted to illustrate the effectiveness of the BB-SRCPSP.

American Psychological Association (APA)

Hu, Shicheng& Wang, Song& Kao, Yonggui& Ito, Takao& Sun, Xuedong. 2015. A Branch and Bound Algorithm for Project Scheduling Problem with Spatial Resource Constraints. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-9.
https://search.emarefa.net/detail/BIM-1074328

Modern Language Association (MLA)

Hu, Shicheng…[et al.]. A Branch and Bound Algorithm for Project Scheduling Problem with Spatial Resource Constraints. Mathematical Problems in Engineering No. 2015 (2015), pp.1-9.
https://search.emarefa.net/detail/BIM-1074328

American Medical Association (AMA)

Hu, Shicheng& Wang, Song& Kao, Yonggui& Ito, Takao& Sun, Xuedong. A Branch and Bound Algorithm for Project Scheduling Problem with Spatial Resource Constraints. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-9.
https://search.emarefa.net/detail/BIM-1074328

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1074328