Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy

Joint Authors

Zhao, Jianmin
Hu, Qiwei
Bai, Yongsheng
Cao, Wenbin

Source

Mathematical Problems in Engineering

Issue

Vol. 2015, Issue 2015 (31 Dec. 2015), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2015-02-16

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Civil Engineering

Abstract EN

In maintenance practice, there is such a situation where the spare parts replacement should be carried out at the scheduling time of calendar or usage for whichever comes first.

The issue of two-dimensional preventive maintenance usually was not addressed by traditional methods, and at present, few studies were focused on this very topic.

Based on these considerations, this paper presented the two-dimensional preventive policy where replacements of spare parts are based on both calendar time and usage time.

A novel model was developed to forecast spare parts demands under two-dimensional preventive maintenance policy, and a discrete algorithm was presented for solving the mathematical model.

A case study was given to demonstrate its applicability and validity, and it was showed that the presented model can be used to forecast spare parts demands as well as to optimize spare parts and preventive maintenance jointly.

American Psychological Association (APA)

Hu, Qiwei& Bai, Yongsheng& Zhao, Jianmin& Cao, Wenbin. 2015. Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-9.
https://search.emarefa.net/detail/BIM-1074595

Modern Language Association (MLA)

Hu, Qiwei…[et al.]. Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy. Mathematical Problems in Engineering No. 2015 (2015), pp.1-9.
https://search.emarefa.net/detail/BIM-1074595

American Medical Association (AMA)

Hu, Qiwei& Bai, Yongsheng& Zhao, Jianmin& Cao, Wenbin. Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-9.
https://search.emarefa.net/detail/BIM-1074595

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1074595