Multilevel Production Systems with Dependent Demand with Uncertainty of Lead Times

Joint Authors

Sadeghi, Haibatolah
Makoui, Ahmad
Heydari, Mehdi

Source

Mathematical Problems in Engineering

Issue

Vol. 2016, Issue 2016 (31 Dec. 2016), pp.1-14, 14 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2016-07-31

Country of Publication

Egypt

No. of Pages

14

Main Subjects

Civil Engineering

Abstract EN

This study considers a multilevel assembly system with several components in each sublevel.

It is assumed that actual lead time for all components is probabilistic; and periodic order quantity (POQ) policy for ordering is utilized.

If at a certain level a job is not received at the expected time, a delay is incurred at the delivery of production at this level and this may result in backorders of the finished product.

It is assumed in this case that a fixed percentage of the shortage is backlogged and other sales are lost.

In the real situation, some but not all customers will wait for backlogged components during a period of shortage, such as for fashionable commodities or high-tech products with the short product life cycle.

The objective of this study is to find the planned lead time and periodicity for the total components in order to minimize the expected fixed ordering, holding, and partial backlogging costs for the finished product.

In this study, it is assumed that a percentage of components at each level are scrap.

A general mathematical model is suggested and the method developed can be used for optimization planned lead time and periodicity for such an MRP system under lead time uncertainties.

American Psychological Association (APA)

Sadeghi, Haibatolah& Makoui, Ahmad& Heydari, Mehdi. 2016. Multilevel Production Systems with Dependent Demand with Uncertainty of Lead Times. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-14.
https://search.emarefa.net/detail/BIM-1112250

Modern Language Association (MLA)

Sadeghi, Haibatolah…[et al.]. Multilevel Production Systems with Dependent Demand with Uncertainty of Lead Times. Mathematical Problems in Engineering No. 2016 (2016), pp.1-14.
https://search.emarefa.net/detail/BIM-1112250

American Medical Association (AMA)

Sadeghi, Haibatolah& Makoui, Ahmad& Heydari, Mehdi. Multilevel Production Systems with Dependent Demand with Uncertainty of Lead Times. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-14.
https://search.emarefa.net/detail/BIM-1112250

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1112250