![](/images/graphics-bg.png)
Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem
Joint Authors
Al-Salem, Mohammed
Bedoya-Valencia, Leonardo
Rabadi, Ghaith
Source
Mathematical Problems in Engineering
Issue
Vol. 2016, Issue 2016 (31 Dec. 2016), pp.1-11, 11 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2016-11-23
Country of Publication
Egypt
No. of Pages
11
Main Subjects
Abstract EN
The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD) for a set of jobs when their weights equal 1 (unweighted problem).
This objective became very significant after the introduction of the Just in Time manufacturing approach.
A procedure to determine whether the CDD is restricted or unrestricted is developed and a semirestricted CDD is defined.
Algorithms are introduced to find the optimal solution when the CDD is unrestricted and semirestricted.
When the CDD is restricted, which is a much harder problem, a heuristic algorithm is proposed to find approximate solutions.
Through computational experiments, the heuristic algorithms’ performance is evaluated with problems up to 500 jobs.
American Psychological Association (APA)
Al-Salem, Mohammed& Bedoya-Valencia, Leonardo& Rabadi, Ghaith. 2016. Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-11.
https://search.emarefa.net/detail/BIM-1112481
Modern Language Association (MLA)
Al-Salem, Mohammed…[et al.]. Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem. Mathematical Problems in Engineering No. 2016 (2016), pp.1-11.
https://search.emarefa.net/detail/BIM-1112481
American Medical Association (AMA)
Al-Salem, Mohammed& Bedoya-Valencia, Leonardo& Rabadi, Ghaith. Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-11.
https://search.emarefa.net/detail/BIM-1112481
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1112481