Cost assessment of preconstruction phase for construction projects in Egypt

Other Title(s)

تقييم التكلفة لمرحلة ما قبل الإنشاء في مشروعات التشييد في مصر

Joint Authors

Muhammad, Khalid Muhammad Ali
Qutub, Mustafa Hasan Ali
Salih, Amin Salih Ali

Source

Journal of Environmental Science

Issue

Vol. 47, Issue 2 (30 Sep. 2019), pp.67-77, 11 p.

Publisher

Ain Shams University Institute of Environmental Studies and Rese Arch Accredited

Publication Date

2019-09-30

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Engineering & Technology Sciences (Multidisciplinary)

Topics

Abstract AR

تهتم صناعة التشييد و البناء بتلبية حاجات عملائها من خلال تنفيذ مشروعات تحقق أهدافهم و تلاقي توقعاتهم و تتميز تلك المشروعات بانھا تنجز في الوقت المحدد و في حدود الميزانيات المرصودة لها و حسب معايير الجودة المطلوبة.

علي الرغم من برامج الاسكان العديدة التى تنفذها الجهات الحكومية المختصة إلا أنه هناك مشكلة حقيقية لإسكان الفقراء و ترجع هذه المشكلة لعدد من الأسباب من بينها عدم قدرة ذوي الدخل المنخفض علي تغطية تكلفة هذه المساكن بالاضافة الي عدم قدرة تلك المساكن على ارضاء حاجة مستخدميها.

من هنا تبرز الحاجة الى تطوير حلول ابداعية و مبتكرة تستطيع إنجاز مشروعات سكنية تنال رضا مستخدميها و بتكلفة اكثر فاعلية في آن واحد وذلك من خلال دمج مفاهيم هندسة القيمة و الازمات في عملية تطوير مشروعات الإسكان المنخفض التكاليف.

و يحاول هذا البحث انجاز ثلاثة أھداف رئيسية: أولا: مراجعة الأدبيات فما يتعلق بالتطور التاريخي لمشروعات الإسكان و مفاهيم رضا العميل و هندسة القيمة و الأزمات في صناعة البناء.

ثانيا: تحديد إمكانية هندسة القيمة و الأزمات ومزاياهم في تطوير مشاريع الإسكان المنخفض التكاليف.

ثالثا: تقديم بعض الدروس المستفادة من مجموعة من الحالات الدراسية لمشاريع ذوي الدخل المنخفض في مصر.

و أخيرا وضع عدد من التوصيات الهامة للجهات الحكومية و المؤسسات التصميمية و المهتمين بقضايالاسكان المنخفض التكاليف

Abstract EN

The construction industry is concerned with satisfying its customers' needs through delivering projects that achieve their objectives and meet their expectations on time, within budget and as specified.

Despite the several housing programmers constructed by government authorities, there is a real housing problem for the poor.

This problem is attributed to a number of reasons.

Amongst them, the inability of the low-incomers to cover the cost of supplied houses and the lack of the constructed projects to achieve users' satisfaction.

This highlighted the need to develop innovative and creative solutions that can deliver housing projects that achieve the satisfaction of their users and at the most-cost effective manner simultaneously.

This aim will be achieved through incorporating the concepts of Value Engineering and Risk Management in developing housing projects for the poor.

Towards this aim, this paper attempts to accomplish three main objectives.

Firstly, reviewing the historical development of housing projects, the concepts of customer satisfaction, VE and RM in construction.

Secondly, identifying the capability of VE and RM and their benefits for developing housing projects for the poor.

Thirdly, presenting learned lessons extracted from case studies of low-income housing projects constructed by the government of the Egypt.

Finally, outlining the research recommendations for government authorities, design firms and construction professionals concerned with housing projects for the poor.

Key words: Value Engineering, Projects Management Time costs qualities relationships, constructions project in Egypt, Low Cost Housing Projects.

 

American Psychological Association (APA)

Muhammad, Khalid Muhammad Ali& Qutub, Mustafa Hasan Ali& Salih, Amin Salih Ali. 2019. Cost assessment of preconstruction phase for construction projects in Egypt. Journal of Environmental Science،Vol. 47, no. 2, pp.67-77.
https://search.emarefa.net/detail/BIM-1115074

Modern Language Association (MLA)

Muhammad, Khalid Muhammad Ali…[et al.]. Cost assessment of preconstruction phase for construction projects in Egypt. Journal of Environmental Science Vol. 47, no. 2 (Sep. 2019), pp.67-77.
https://search.emarefa.net/detail/BIM-1115074

American Medical Association (AMA)

Muhammad, Khalid Muhammad Ali& Qutub, Mustafa Hasan Ali& Salih, Amin Salih Ali. Cost assessment of preconstruction phase for construction projects in Egypt. Journal of Environmental Science. 2019. Vol. 47, no. 2, pp.67-77.
https://search.emarefa.net/detail/BIM-1115074

Data Type

Journal Articles

Language

English

Notes

-

Record ID

BIM-1115074