Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis

Joint Authors

Nguyen, Phuong
Akhavian, Reza

Source

Advances in Civil Engineering

Issue

Vol. 2019, Issue 2019 (31 Dec. 2019), pp.1-9, 9 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2019-07-01

Country of Publication

Egypt

No. of Pages

9

Main Subjects

Civil Engineering

Abstract EN

In the recent years, owners and construction management companies have shown an increasingly more interest in adopting approaches that result in enhanced quality and less risks, conflicts, and wastes on their projects despite potentially higher initial cost.

Implementing advanced technology trends and incorporating more integrated methods of delivering projects have proven to be highly value-adding and forward-thinking approaches.

The objective of this research was to evaluate the effectiveness of and the synergy between three of such trending concepts in the construction industry, namely, integrated project delivery (IPD), lean principles, and building information modeling (BIM) in terms of cost and schedule performance measures.

Data analysis was conducted on 72 vertical projects through interviews and study of the published articles, reports, and case studies.

Qualitative analysis was performed through grounded theory while quantitative analysis was implemented using univariate and multivariate analysis of variance tests on schedule performance and cost performance.

Results of the grounded theory analysis summarize six crucial characteristics required for an effective coordination between IPD, lean construction, and BIM.

Statistical analysis on different combination of these three components revealed considerable effectiveness in terms of schedule performance while the effect on cost performance was not as much significant.

This study contributes to the body of knowledge and practice in the field of construction by demonstrating the cost and schedule benefits realized through the use of IPD, lean construction, and BIM and identifying their collective conceptual advantages.

American Psychological Association (APA)

Nguyen, Phuong& Akhavian, Reza. 2019. Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-9.
https://search.emarefa.net/detail/BIM-1115372

Modern Language Association (MLA)

Nguyen, Phuong& Akhavian, Reza. Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis. Advances in Civil Engineering No. 2019 (2019), pp.1-9.
https://search.emarefa.net/detail/BIM-1115372

American Medical Association (AMA)

Nguyen, Phuong& Akhavian, Reza. Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-9.
https://search.emarefa.net/detail/BIM-1115372

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1115372