Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”
Joint Authors
Source
Issue
Vol. 2019, Issue 2019 (31 Dec. 2019), pp.1-1, 1 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2019-03-03
Country of Publication
Egypt
No. of Pages
1
Main Subjects
Abstract EN
In the article titled “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” [1], Dr.
Changsheng Wu was incorrectly listed as the corresponding author.
The corresponding author is Dr.
Zhiduo Zhu.
American Psychological Association (APA)
Wu, Changsheng& Zhu, Zhiduo. 2019. Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-1.
https://search.emarefa.net/detail/BIM-1117510
Modern Language Association (MLA)
Wu, Changsheng& Zhu, Zhiduo. Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”. Advances in Civil Engineering No. 2019 (2019), pp.1-1.
https://search.emarefa.net/detail/BIM-1117510
American Medical Association (AMA)
Wu, Changsheng& Zhu, Zhiduo. Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-1.
https://search.emarefa.net/detail/BIM-1117510
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1117510