Excavation Sequence and Surrounding Rock Mass Stability of Large-Scale Underground Engineering with 8 Tunnels

Joint Authors

Chen, Fangfang
Zhang, Zhiqiang
He, Mingming
Li, Ning

Source

Advances in Civil Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-09-04

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

In some large-scale hydroelectric power projects, there are more than 3 tunnels that are too close to each other to eliminate the mutual influence during the excavation period, especially for large-scale tunnel groups.

In this paper, aimed at analyzing the Bukun hydropower station consisting of 8 tunnels in Malaysia, the displacement, stress, and plastic zone of the surrounding rock mass are analyzed to study the effect of the excavation sequence on the stability of the surrounding rock mass for large-scale tunnel groups.

On the one hand, the in situ monitoring of the surface displacement of the rock mass surrounding the tunnel using extensometers is performed to obtain the deformation characteristics on the excavation limit under the typical excavation sequence.

On the other hand, a series of elastic-plastic 3D numerical experiments are carried out to explore the displacement characteristics, stability of the large-scale tunnel groups, and safety of the initial supporting system.

The results show that the tendencies of the displacement increase corresponding to the tunnel face movement are similar for the three excavation sequences.

The displacement under initial excavation sequence 2 (IES2) is the smallest among the three sequences; the area of the plastic zone under IES2 is the smallest among them; and the stresses in the shotcrete layer and axial forces in the rock bolt under the three excavation sequences are within the safety limitation.

Initial excavation sequence 2 is an optimized excavation sequence, in which tunnels #1 and #5 are excavated first; after an advance of 3 times the diameter of the tunnel, tunnels #3 and #7 are excavated; tunnels #2 and #6 are excavated after an advance of 3 times diameters; and tunnels #4 and #8 are excavated after an advance of 3 times diameters.

American Psychological Association (APA)

Zhang, Zhiqiang& He, Mingming& Chen, Fangfang& Li, Ning. 2020. Excavation Sequence and Surrounding Rock Mass Stability of Large-Scale Underground Engineering with 8 Tunnels. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1121311

Modern Language Association (MLA)

Zhang, Zhiqiang…[et al.]. Excavation Sequence and Surrounding Rock Mass Stability of Large-Scale Underground Engineering with 8 Tunnels. Advances in Civil Engineering No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1121311

American Medical Association (AMA)

Zhang, Zhiqiang& He, Mingming& Chen, Fangfang& Li, Ning. Excavation Sequence and Surrounding Rock Mass Stability of Large-Scale Underground Engineering with 8 Tunnels. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1121311

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1121311