Estimation of the Occurrence Time of Thaumasite Sulfate Attack on Tunnel Lining Concrete

Joint Authors

Xu, Chongbang
Gao, Xiaojing
Zhang, Kaishun
Li, Xuefeng

Source

Advances in Civil Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-11-26

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Civil Engineering

Abstract EN

The thaumasite sulfate attack (TSA) on tunnel concrete structure has been reported increasingly in the past decades.

Previous investigations on the formation of thaumasite were focused on identifying the deterioration products and reaction mechanisms, while the occurrence time of TSA on tunnel concrete structures was not reported.

A highway tunnel exposed to TSA was reported in the present study.

The development of tunnel diseases and results of experimental tests conducted in the tunnel and in the laboratory were analyzed to investigate the occurrence time of TSA on concrete.

Results revealed that the thaumasite was formed in a range of 18 to 36 months after the construction of Dugongling tunnel.

The preconditions for the formation of thaumasite on tunnel concrete structures are available in Shanxi Province, China, due to the special conditions of stratum lithology and climate.

The compositions of corrosion products of lining concrete under TSA varied for site studies and for laboratory tests.

Site investigations on TSA on tunnel lining concrete should be paid more attention in further research.

American Psychological Association (APA)

Xu, Chongbang& Gao, Xiaojing& Li, Xuefeng& Zhang, Kaishun. 2020. Estimation of the Occurrence Time of Thaumasite Sulfate Attack on Tunnel Lining Concrete. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1122434

Modern Language Association (MLA)

Xu, Chongbang…[et al.]. Estimation of the Occurrence Time of Thaumasite Sulfate Attack on Tunnel Lining Concrete. Advances in Civil Engineering No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1122434

American Medical Association (AMA)

Xu, Chongbang& Gao, Xiaojing& Li, Xuefeng& Zhang, Kaishun. Estimation of the Occurrence Time of Thaumasite Sulfate Attack on Tunnel Lining Concrete. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1122434

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1122434