Bayesian Approach for Sequential Probabilistic Back Analysis of Uncertain Geomechanical Parameters and Reliability Updating of Tunneling-Induced Ground Settlements

Joint Authors

Huang, Jinsong
Li, Cong
Jiang, Shui-Hua
Li, Jinhui

Source

Advances in Civil Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-13, 13 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-06-24

Country of Publication

Egypt

No. of Pages

13

Main Subjects

Civil Engineering

Abstract EN

This paper proposes a new sequential probabilistic back analysis approach for probabilistically determining the uncertain geomechanical parameters of shield tunnels by using time-series monitoring data.

The approach is proposed based on the recently developed Bayesian updating with subset simulation.

Within the framework of the proposed approach, a complex Bayesian back analysis problem is transformed into an equivalent structural reliability problem based on subset simulation.

Hermite polynomial chaos expansion-based surrogate models are constructed to improve the computational efficiency of probabilistic back analysis.

The reliability of tunneling-induced ground settlements is updated in the process of sequential back analyses.

A real shield tunnel project of No.

1 Nanchang Metro Line in China is investigated to assess the effectiveness of the approach.

The proposed approach is able to infer the posterior distributions of uncertain geomechanical parameters (i.e., Young’s moduli of surrounding soil layers and ground vehicle load).

The reliability of tunneling-induced ground settlements can be updated in a real-time manner by fully utilizing the time-series monitoring data.

The results show good agreement with the variation trend of field monitoring data of ground settlement and the post-event investigations.

American Psychological Association (APA)

Li, Cong& Jiang, Shui-Hua& Li, Jinhui& Huang, Jinsong. 2020. Bayesian Approach for Sequential Probabilistic Back Analysis of Uncertain Geomechanical Parameters and Reliability Updating of Tunneling-Induced Ground Settlements. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-13.
https://search.emarefa.net/detail/BIM-1122948

Modern Language Association (MLA)

Li, Cong…[et al.]. Bayesian Approach for Sequential Probabilistic Back Analysis of Uncertain Geomechanical Parameters and Reliability Updating of Tunneling-Induced Ground Settlements. Advances in Civil Engineering No. 2020 (2020), pp.1-13.
https://search.emarefa.net/detail/BIM-1122948

American Medical Association (AMA)

Li, Cong& Jiang, Shui-Hua& Li, Jinhui& Huang, Jinsong. Bayesian Approach for Sequential Probabilistic Back Analysis of Uncertain Geomechanical Parameters and Reliability Updating of Tunneling-Induced Ground Settlements. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-13.
https://search.emarefa.net/detail/BIM-1122948

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1122948