The Influence of Complex Subway Station Construction on High Retaining Walls and Appropriate Countermeasures

Joint Authors

Wang, Kai
Li, Zhaoping
Xu, Xuezhao
Zhang, Fanbo
Shi, Leilei

Source

Advances in Civil Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-12, 12 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-07-31

Country of Publication

Egypt

No. of Pages

12

Main Subjects

Civil Engineering

Abstract EN

Anzhen Bridge Station of Beijing metro line 12, which adopts a separated-island platform constructed by the undermining method, passes along the retaining wall of the North Third Ring Road.

A numerical simulation method is adopted to study the deformation laws of the retaining wall under the influence of station construction.

The simulation data show that the affected retaining wall will have large settlement and tilt, and countermeasures must be taken.

Four countermeasures are formulated, and their control effects are analyzed.

The calculation results show that the combination of anchor cables and waist beams can effectively control the tilt of the retaining wall, but the control effect on the absolute settlement is not obvious.

The control effect of isolation piles is better than that of foundation grouting.

The joint control method of anchor cables combined with waist beams, isolation piles, and deep hole grouting makes the deformation meet the target, and according to this measure, a concept of joint control aiming at the influence of the “source,” “propagation,” and “object” is proposed, which can provide a reference for similar projects with a great difficulty in deformation control.

American Psychological Association (APA)

Wang, Kai& Li, Zhaoping& Xu, Xuezhao& Shi, Leilei& Zhang, Fanbo. 2020. The Influence of Complex Subway Station Construction on High Retaining Walls and Appropriate Countermeasures. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-12.
https://search.emarefa.net/detail/BIM-1124109

Modern Language Association (MLA)

Wang, Kai…[et al.]. The Influence of Complex Subway Station Construction on High Retaining Walls and Appropriate Countermeasures. Advances in Civil Engineering No. 2020 (2020), pp.1-12.
https://search.emarefa.net/detail/BIM-1124109

American Medical Association (AMA)

Wang, Kai& Li, Zhaoping& Xu, Xuezhao& Shi, Leilei& Zhang, Fanbo. The Influence of Complex Subway Station Construction on High Retaining Walls and Appropriate Countermeasures. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-12.
https://search.emarefa.net/detail/BIM-1124109

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1124109