Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”

Author

Shirzadeh Chaleshtarti, A.

Source

Advances in Operations Research

Issue

Vol. 2017, Issue 2017 (31 Dec. 2017), pp.1-1, 1 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2017-07-12

Country of Publication

Egypt

No. of Pages

1

Main Subjects

Information Technology and Computer Science

Abstract EN

In the article titled “Resource Tardiness Weighted Cost Minimization in Project Scheduling” [1], the affiliation of the author was given incorrectly.

The correct affiliation is shown above.

American Psychological Association (APA)

Shirzadeh Chaleshtarti, A.. 2017. Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”. Advances in Operations Research،Vol. 2017, no. 2017, pp.1-1.
https://search.emarefa.net/detail/BIM-1125232

Modern Language Association (MLA)

Shirzadeh Chaleshtarti, A.. Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”. Advances in Operations Research No. 2017 (2017), pp.1-1.
https://search.emarefa.net/detail/BIM-1125232

American Medical Association (AMA)

Shirzadeh Chaleshtarti, A.. Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”. Advances in Operations Research. 2017. Vol. 2017, no. 2017, pp.1-1.
https://search.emarefa.net/detail/BIM-1125232

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1125232