![](/images/graphics-bg.png)
Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”
Author
Source
Advances in Operations Research
Issue
Vol. 2017, Issue 2017 (31 Dec. 2017), pp.1-1, 1 p.
Publisher
Hindawi Publishing Corporation
Publication Date
2017-07-12
Country of Publication
Egypt
No. of Pages
1
Main Subjects
Information Technology and Computer Science
Abstract EN
In the article titled “Resource Tardiness Weighted Cost Minimization in Project Scheduling” [1], the affiliation of the author was given incorrectly.
The correct affiliation is shown above.
American Psychological Association (APA)
Shirzadeh Chaleshtarti, A.. 2017. Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”. Advances in Operations Research،Vol. 2017, no. 2017, pp.1-1.
https://search.emarefa.net/detail/BIM-1125232
Modern Language Association (MLA)
Shirzadeh Chaleshtarti, A.. Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”. Advances in Operations Research No. 2017 (2017), pp.1-1.
https://search.emarefa.net/detail/BIM-1125232
American Medical Association (AMA)
Shirzadeh Chaleshtarti, A.. Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”. Advances in Operations Research. 2017. Vol. 2017, no. 2017, pp.1-1.
https://search.emarefa.net/detail/BIM-1125232
Data Type
Journal Articles
Language
English
Notes
Includes bibliographical references
Record ID
BIM-1125232