Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure

Joint Authors

He, Qun
Chen, Xiaobin
Li, Shuanglong
Wei, Limin

Source

Advances in Civil Engineering

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-16, 16 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-09-30

Country of Publication

Egypt

No. of Pages

16

Main Subjects

Civil Engineering

Abstract EN

To address the track irregularity at transition zones between subgrade and rigid structures (bridge, tunnel, etc.), some common transition approaches, such as trapezoid subgrade, were adopted in many engineering areas.

However, in regard to a mountainous area, the common transition approaches may not be practicable anymore due to the limitation of the length between subgrade and rigid structures.

In this paper, a new type of bridge-tunnel transition section with a deeply buried pile-plank structure (DBPPS) for short-distance transition is introduced.

A three-dimensional finite element model that considers vehicle-track-subgrade coupling vibration is proposed to study the dynamic performances of a DBPPS transition section in the Shanghai–Kunming high-speed railway.

With this model that has been validated with measured responses from field tests, the dynamic responses and the smoothness in track stiffness along the transition zone are analyzed.

In addition, the influences of train speed, axle load, and train direction on dynamic responses are investigated, and the influences of two optimization strategies, including varying-length piles and constant-length piles, on the stiffness smoothness of the DBPPS transition section are discussed.

Results show that the vibration level of the DBPPS transition section is lower than that of the abutment and the tunnel, and the additional load caused by vertical track stiffness difference aggravates the vibration at the connections between the DBPPS transition section and the abutment (or tunnel).

Furthermore, the smoothness in stiffness along the transition zone can be significantly improved by the improvement strategy with varying-length piles.

American Psychological Association (APA)

Li, Shuanglong& Wei, Limin& Chen, Xiaobin& He, Qun. 2020. Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1125287

Modern Language Association (MLA)

Li, Shuanglong…[et al.]. Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure. Advances in Civil Engineering No. 2020 (2020), pp.1-16.
https://search.emarefa.net/detail/BIM-1125287

American Medical Association (AMA)

Li, Shuanglong& Wei, Limin& Chen, Xiaobin& He, Qun. Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1125287

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1125287