Parallel Machine Production and Transportation Operations’ Scheduling with Tight Time Windows

Joint Authors

Chen, Yao
He, Tong
Xiong, Jie
Wu, Xin
Jiang, Yang

Source

Complexity

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-11, 11 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-10-10

Country of Publication

Egypt

No. of Pages

11

Main Subjects

Philosophy

Abstract EN

This study addresses a parallel machine production and transportation operations’ scheduling problem with a tight time window associated with the transfer and delivery process.

The orders located at the parallel machines need to be delivered to customers by train.

Each order must be processed within a limited completion time in order for the product to be matched with the optimal trip to its destination within the delivery period.

A mathematical analysis method is used to reveal the impact of tight time windows on the scheduling of production and transportation operations.

The order transfer redundancy time and order transfer waiting time are employed to reflect the impact scheduling of production on the transfer process.

The order delivery redundancy time and order delivery waiting time are used to describe delivery operations.

The goal is to maximize the coordination level of order transfer and delivery, which are reflected in the order transfer time and the order delivery time, respectively.

Additionally, a simulated annealing algorithm using the column generation technique was developed to solve this problem.

The results show that the use of the system coordination model in this method obviously improves the number of successful transfers and deliveries.

American Psychological Association (APA)

Jiang, Yang& He, Tong& Xiong, Jie& Wu, Xin& Chen, Yao. 2020. Parallel Machine Production and Transportation Operations’ Scheduling with Tight Time Windows. Complexity،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1139896

Modern Language Association (MLA)

Jiang, Yang…[et al.]. Parallel Machine Production and Transportation Operations’ Scheduling with Tight Time Windows. Complexity No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1139896

American Medical Association (AMA)

Jiang, Yang& He, Tong& Xiong, Jie& Wu, Xin& Chen, Yao. Parallel Machine Production and Transportation Operations’ Scheduling with Tight Time Windows. Complexity. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1139896

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1139896