Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network

Joint Authors

Bai, Libiao
Zhang, Kaimin
Shi, Huijing
An, Min
Han, Xiao

Source

Complexity

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-21, 21 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-11-05

Country of Publication

Egypt

No. of Pages

21

Main Subjects

Philosophy

Abstract EN

Resource risk caused by specific resource sharing or competition among projects due to resource constraints is a major issue in project portfolio management, which challenges the application of risk analysis methods effectively.

This paper presents a methodology by using a fuzzy Bayesian network to assess the project portfolio resource risk, determine critical resource risk factors, and propose risk-reduction strategies.

In this method, the project portfolio resource risk factors are first identified by taking project interdependency into consideration, and then the Bayesian network model is developed to analyze the risk level of the identified risk factors in which expert judgments and fuzzy set theory are integrated to determine the probabilities of all risk factors to deal with incomplete risk data and information.

To reduce the subjectivity of expert judgments, the expert weights are determined by combining experts’ background and reliability degree of expert judgments.

A numerical analysis is used to demonstrate the application of the proposed methodology.

The results show that project portfolio resource risks can be analyzed effectively and efficiently.

Furthermore, “poor communication and cooperation among projects,” “capital difficulty,” and “lack of sharing technology among projects” are considered the leading factors of the project portfolio resource risk.

Risk-reduction strategic decisions based on the results of risk assessment can be made, which provide project managers with a useful method or tool to manage project risks.

American Psychological Association (APA)

Bai, Libiao& Zhang, Kaimin& Shi, Huijing& An, Min& Han, Xiao. 2020. Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network. Complexity،Vol. 2020, no. 2020, pp.1-21.
https://search.emarefa.net/detail/BIM-1142441

Modern Language Association (MLA)

Bai, Libiao…[et al.]. Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network. Complexity No. 2020 (2020), pp.1-21.
https://search.emarefa.net/detail/BIM-1142441

American Medical Association (AMA)

Bai, Libiao& Zhang, Kaimin& Shi, Huijing& An, Min& Han, Xiao. Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network. Complexity. 2020. Vol. 2020, no. 2020, pp.1-21.
https://search.emarefa.net/detail/BIM-1142441

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1142441