Social Risk Early Warning of Environmental Damage of Large-Scale Construction Projects in China Based on Network Governance and LSTM Model

Joint Authors

Huang, Dechun
Fang, Junmin
Xu, Jingrong

Source

Complexity

Issue

Vol. 2020, Issue 2020 (31 Dec. 2020), pp.1-13, 13 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2020-11-26

Country of Publication

Egypt

No. of Pages

13

Main Subjects

Philosophy

Abstract EN

With the improvement of citizens’ risk perception ability and environmental protection awareness, social conflicts caused by environmental problems in large-scale construction projects are becoming more and more frequent.

Traditional social risk prevention management has some defects in obtaining risk data, such as limited coverage, poor availability, and insufficient timeliness, which makes it impossible to realize effective early warning of social risks in the era of big data.

This paper focuses on the three environments of diversification of stakeholders, risk media, and big data era.

The evolution characteristics of the social risk of environmental damage of large-scale construction projects are analyzed from the four stages of incubation, outbreak, mitigation, and regression in essence.

On this basis, a social risk early warning model is constructed, and the multicenter network governance mode of social risk of environmental damage in large-scale construction projects and practical social risk prevention strategies in different stages are put forward.

Experiments show that the long short-term memory neural network model is effective and feasible for predicting the social risk trend of environmental damage of large-scale construction projects.

Compared with other classical models, the long short-term memory model has the advantages of strong processing capability and high early warning accuracy for time-sensitive data and will have broad application prospects in the field of risk control research.

By using the network governance framework and long short-term memory model, this paper studies the environmental mass events of large-scale construction projects on the risk early warning method, providing reference for the government to effectively prevent and control social risk of environmental damage of large-scale construction project in China.

American Psychological Association (APA)

Fang, Junmin& Huang, Dechun& Xu, Jingrong. 2020. Social Risk Early Warning of Environmental Damage of Large-Scale Construction Projects in China Based on Network Governance and LSTM Model. Complexity،Vol. 2020, no. 2020, pp.1-13.
https://search.emarefa.net/detail/BIM-1144980

Modern Language Association (MLA)

Fang, Junmin…[et al.]. Social Risk Early Warning of Environmental Damage of Large-Scale Construction Projects in China Based on Network Governance and LSTM Model. Complexity No. 2020 (2020), pp.1-13.
https://search.emarefa.net/detail/BIM-1144980

American Medical Association (AMA)

Fang, Junmin& Huang, Dechun& Xu, Jingrong. Social Risk Early Warning of Environmental Damage of Large-Scale Construction Projects in China Based on Network Governance and LSTM Model. Complexity. 2020. Vol. 2020, no. 2020, pp.1-13.
https://search.emarefa.net/detail/BIM-1144980

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1144980