Mode-Based versus Activity-Based Search for a Nonredundant Resolution of the Multimode Resource-Constrained Project Scheduling Problem

Joint Authors

Salido, Miguel A.
Barber, Federico
Morillo, Daniel

Source

Mathematical Problems in Engineering

Issue

Vol. 2017, Issue 2017 (31 Dec. 2017), pp.1-15, 15 p.

Publisher

Hindawi Publishing Corporation

Publication Date

2017-10-11

Country of Publication

Egypt

No. of Pages

15

Main Subjects

Civil Engineering

Abstract EN

This paper addresses an energy-based extension of the Multimode Resource-Constrained Project Scheduling Problem (MRCPSP) called MRCPSP-ENERGY.

This extension considers the energy consumption as an additional resource that leads to different execution modes (and durations) of the activities.

Consequently, different schedules can be obtained.

The objective is to maximize the efficiency of the project, which takes into account the minimization of both makespan and energy consumption.

This is a well-known NP-hard problem, such that the application of metaheuristic techniques is necessary to address real-size problems in a reasonable time.

This paper shows that the Activity List representation, commonly used in metaheuristics, can lead to obtaining many redundant solutions, that is, solutions that have different representations but are in fact the same.

This is a serious disadvantage for a search procedure.

We propose a genetic algorithm (GA) for solving the MRCPSP-ENERGY, trying to avoid redundant solutions by focusing the search on the execution modes, by using the Mode List representation.

The proposed GA is evaluated on different instances of the PSPLIB-ENERGY library and compared to the results obtained by both exact methods and approximate methods reported in the literature.

This library is an extension of the well-known PSPLIB library, which contains MRCPSP-ENERGY test cases.

American Psychological Association (APA)

Morillo, Daniel& Barber, Federico& Salido, Miguel A.. 2017. Mode-Based versus Activity-Based Search for a Nonredundant Resolution of the Multimode Resource-Constrained Project Scheduling Problem. Mathematical Problems in Engineering،Vol. 2017, no. 2017, pp.1-15.
https://search.emarefa.net/detail/BIM-1190450

Modern Language Association (MLA)

Morillo, Daniel…[et al.]. Mode-Based versus Activity-Based Search for a Nonredundant Resolution of the Multimode Resource-Constrained Project Scheduling Problem. Mathematical Problems in Engineering No. 2017 (2017), pp.1-15.
https://search.emarefa.net/detail/BIM-1190450

American Medical Association (AMA)

Morillo, Daniel& Barber, Federico& Salido, Miguel A.. Mode-Based versus Activity-Based Search for a Nonredundant Resolution of the Multimode Resource-Constrained Project Scheduling Problem. Mathematical Problems in Engineering. 2017. Vol. 2017, no. 2017, pp.1-15.
https://search.emarefa.net/detail/BIM-1190450

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references

Record ID

BIM-1190450